| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Constr of Cement Concrete Roads | 82 | 1 | 57 | 2 | 0.23 | 0.18 | 76% |
| 2 | Cattle Shed | 59 | 0 | 23 | 0 | 0.45 | 0.40 | 89% |
| 3 | Plantation | 41 | 5 | 18 | 15 | 3.68 | 2.21 | 60% |
| 4 | Construction of Check Dam/Stop Dam | 29 | 1 | 10 | 17 | 1.72 | 1.26 | 73% |
| 5 | Construction of Road and Culvert | 25 | 1 | 17 | 0 | 1.66 | 0.89 | 54% |
| 6 | Land Development | 15 | 0 | 5 | 8 | 0.03 | 0.01 | 48% |
| 7 | Farm Pond | 14 | 2 | 10 | 0 | 0.24 | 0.18 | 76% |
| 8 | Works for Flood Control and Protection | 13 | 1 | 9 | 2 | 1.48 | 0.82 | 55% |
| 9 | Construction of Trench | 9 | 2 | 3 | 4 | 0.74 | 0.70 | 94% |
| 10 | Construction of Tank | 8 | 2 | 0 | 5 | 0.23 | 0.16 | 72% |
| 11 | Rural Housing | 7 | 0 | 4 | 1 | 0.01 | 0.01 | 48% |
| 12 | Constr of Aganwadi | 6 | 0 | 0 | 0 | 0.08 | 0.02 | 19% |
| 13 | Construction of Recharge Pits | 6 | 1 | 0 | 4 | 0.01 | 0.00 | 0% |
| 14 | Boulder Check/Gully Plug | 3 | 2 | 0 | 1 | 0.08 | 0.04 | 55% |
| 15 | Construction of Canal | 3 | 0 | 1 | 2 | 0.05 | 0.02 | 46% |
| 16 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 3 | 0 | 0 | 3 | 0.00 | 0.00 | 0% |
| 17 | Constr of Food Grain storage | 3 | 0 | 0 | 3 | 0.00 | 0.00 | 0% |
| 18 | Repair & maint of Pond/ Tank | 2 | 0 | 1 | 1 | 0.02 | 0.01 | 78% |
| 19 | Renovation of traditional water bodies | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 20 | Well Recharge | 2 | 0 | 1 | 0 | 0.00 | 0.00 | 2% |
| 21 | Repair & Maint of Check Dam/Stop Dam | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 22 | Solid and Liquid Waste Management | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 23 | Deepening / Desilting of Flood Channels | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 24 | Constr of GP Bhawan | 1 | 0 | 1 | 0 | 0.15 | 0.10 | 71% |
| 25 | Construction of NADEP/Vermi Compost Pit | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 26 | Construction of Other Community Building/Assets | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 27 | Construction of Percolation Tank | 1 | 1 | 0 | 0 | 0.25 | 0.19 | 79% |
| 28 | Constr of Gabion | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 29 | Construction of Bund | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 30 | Community Sanitary Complex | 1 | 0 | 1 | 0 | 0.01 | 0.00 | 27% |
| Total | 344 | 19 | 161 | 72 | 11.12 | 7.22 |