MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Construction of Toilets 291 0 91 0 0.06 0.04
64%
2 Plantation 57 2 24 14 1.66 1.14
69%
3 Constr of Cement Concrete Roads 30 1 17 2 0.13 0.09
71%
4 Land Development 30 0 15 0 0.06 0.05
94%
5 Farm Pond 21 2 17 0 0.23 0.12
52%
6 Construction of Road and Culvert 19 1 10 3 0.75 0.47
62%
7 Cattle Shed 19 0 13 0 0.13 0.09
70%
8 Construction of Check Dam/Stop Dam 17 0 13 3 0.74 0.45
60%
9 Construction of NADEP/Vermi Compost Pit 14 0 1 12 0.01 0.00
37%
10 Construction of Trench 7 0 0 1 0.00 0.00
0%
11 Works for Flood Control and Protection 6 0 4 1 0.34 0.14
40%
12 Renovation of traditional water bodies 6 0 3 0 0.00 0.00
0%
13 Construction of Tank 5 1 1 1 0.19 0.03
17%
14 Repair & Maint of Check Dam/Stop Dam 3 0 1 2 0.20 0.20
99%
15 Constr of Compound wall 3 0 0 0 0.08 0.00
0%
16 Boulder Check/Gully Plug 2 0 2 0 0.08 0.07
79%
17 Constr of Food Grain storage 2 0 1 1 0.00 0.00
22%
18 Rural Housing 2 0 2 0 0.00 0.00
101%
19 Construction of Bund 2 0 2 0 0.29 0.29
100%
20 Constr of GP Bhawan 2 1 1 0 0.18 0.12
66%
21 Construction of Percolation Tank 1 0 0 1 0.25 0.00
0%
22 Construction of Crematorium 1 0 1 0 0.02 0.02
86%
23 Constr of Gabion 1 0 1 0 0.14 0.00
0%
24 Repair & maint of Pond/ Tank 1 0 0 1 0.00 0.00
0%
25 Repair & maint of Road 1 0 0 1 0.00 0.00
0%
26 Construction of Play field 1 0 0 0 0.03 0.00
0%
Total 544 8 220 43 5.58 3.32
All 26 rows (zero-value rows hidden) ⇩ Export to Excel