| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction of Tank | 46 | 10 | 1 | 2 | 3.39 | 0.91 | 27% |
| 2 | Construction of Check Dam/Stop Dam | 21 | 1 | 12 | 5 | 2.01 | 1.80 | 90% |
| 3 | Plantation | 16 | 2 | 10 | 4 | 1.72 | 1.40 | 81% |
| 4 | Construction of Bund | 16 | 3 | 3 | 10 | 1.43 | 0.72 | 51% |
| 5 | Constr of Cement Concrete Roads | 12 | 0 | 9 | 0 | 0.04 | 0.06 | 140% |
| 6 | Construction of Road and Culvert | 10 | 0 | 5 | 0 | 0.33 | 0.08 | 26% |
| 7 | Land Development | 8 | 0 | 4 | 0 | 0.01 | 0.01 | 52% |
| 8 | Boulder Check/Gully Plug | 6 | 0 | 5 | 1 | 0.74 | 0.62 | 83% |
| 9 | Cattle Shed | 5 | 0 | 5 | 0 | 0.05 | 0.04 | 77% |
| 10 | Well Recharge | 5 | 0 | 0 | 0 | 0.01 | 0.00 | 0% |
| 11 | Constr of Gabion | 4 | 0 | 0 | 4 | 0.00 | 0.00 | 0% |
| 12 | Construction of Crematorium | 4 | 0 | 2 | 0 | 0.04 | 0.02 | 43% |
| 13 | Construction of Trench | 3 | 1 | 1 | 1 | 0.30 | 0.09 | 31% |
| 14 | Farm Pond | 3 | 0 | 2 | 0 | 0.00 | 0.00 | 96% |
| 15 | Construction of Percolation Tank | 2 | 0 | 2 | 0 | 0.28 | 0.24 | 86% |
| 16 | Constr of GP Bhawan | 2 | 1 | 0 | 1 | 0.12 | 0.01 | 12% |
| 17 | Rural Housing | 2 | 0 | 2 | 0 | 0.00 | 0.00 | 93% |
| 18 | Works for Flood Control and Protection | 1 | 0 | 1 | 0 | 0.13 | 0.08 | 62% |
| 19 | Construction of Play field | 1 | 0 | 1 | 0 | 0.02 | 0.00 | 1% |
| 20 | Renovation of traditional water bodies | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| Total | 168 | 18 | 65 | 28 | 10.60 | 6.07 |