| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction of NADEP/Vermi Compost Pit | 54 | 0 | 46 | 5 | 0.15 | 0.08 | 51% |
| 2 | Rural Housing | 49 | 0 | 49 | 0 | 0.08 | 0.08 | 96% |
| 3 | Plantation | 34 | 4 | 23 | 1 | 0.64 | 0.10 | 16% |
| 4 | Cattle Shed | 26 | 0 | 21 | 0 | 0.17 | 0.14 | 84% |
| 5 | Constr of Cement Concrete Roads | 23 | 0 | 18 | 0 | 0.19 | 0.15 | 81% |
| 6 | Works for Flood Control and Protection | 22 | 0 | 14 | 0 | 1.68 | 1.25 | 75% |
| 7 | Construction of Road and Culvert | 22 | 0 | 15 | 0 | 2.18 | 1.52 | 70% |
| 8 | Farm Pond | 14 | 0 | 11 | 0 | 0.03 | 0.03 | 96% |
| 9 | Land Development | 13 | 0 | 7 | 0 | 0.01 | 0.01 | 73% |
| 10 | Construction of Crematorium | 7 | 0 | 5 | 0 | 0.13 | 0.09 | 68% |
| 11 | Construction of Tank | 7 | 5 | 1 | 0 | 0.89 | 0.37 | 41% |
| 12 | Construction of Check Dam/Stop Dam | 6 | 0 | 5 | 0 | 0.31 | 0.27 | 87% |
| 13 | Construction of Recharge Pits | 5 | 0 | 4 | 1 | 0.01 | 0.01 | 77% |
| 14 | Construction of Embankment | 5 | 0 | 3 | 0 | 0.43 | 0.35 | 80% |
| 15 | Construction of Percolation Tank | 4 | 1 | 2 | 0 | 0.29 | 0.12 | 42% |
| 16 | Renovation of traditional water bodies | 4 | 0 | 3 | 0 | 0.00 | 0.01 | 204% |
| 17 | Deepening / Desilting of Flood Channels | 3 | 0 | 1 | 0 | 0.02 | 0.01 | 76% |
| 18 | Construction of Trench | 3 | 0 | 2 | 0 | 0.00 | 0.00 | 154% |
| 19 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 2 | 0 | 1 | 0 | 0.15 | 0.14 | 93% |
| 20 | Community Sanitary Complex | 2 | 0 | 1 | 0 | 0.00 | 0.00 | 89% |
| 21 | Constr of Gabion | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 22 | Repair & maint of Pond/ Tank | 2 | 0 | 1 | 0 | 0.01 | 0.01 | 91% |
| 23 | Roof Water Harvesting on gov/panchayat bldg | 2 | 0 | 1 | 1 | 0.00 | 0.00 | 43% |
| 24 | Construction of Bund | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 25 | Repair & Maint of Check Dam/Stop Dam | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 26 | Constr of Aganwadi | 1 | 0 | 1 | 0 | 0.03 | 0.03 | 90% |
| 27 | Construction of Toilets | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 28 | Repair & maint of Water Harvesting Structures | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 96% |
| 29 | Construction of Play field | 1 | 0 | 1 | 0 | 0.02 | 0.00 | 1% |
| 30 | Solid and Liquid Waste Management | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 31 | Constr of GP Bhawan | 1 | 0 | 1 | 0 | 0.14 | 0.09 | 63% |
| Total | 320 | 10 | 238 | 9 | 7.58 | 4.86 |