| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction of Road and Culvert | 69 | 0 | 32 | 0 | 2.86 | 2.48 | 87% |
| 2 | Rural Housing | 43 | 0 | 14 | 0 | 0.07 | 0.02 | 29% |
| 3 | Cattle Shed | 38 | 0 | 32 | 0 | 0.30 | 0.25 | 81% |
| 4 | Works for Flood Control and Protection | 35 | 2 | 18 | 0 | 2.00 | 1.56 | 78% |
| 5 | Construction of Check Dam/Stop Dam | 28 | 0 | 19 | 2 | 1.58 | 1.01 | 64% |
| 6 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 25 | 0 | 14 | 2 | 2.46 | 1.85 | 75% |
| 7 | Farm Pond | 14 | 0 | 7 | 0 | 0.15 | 0.14 | 95% |
| 8 | Construction of Bund | 12 | 8 | 3 | 0 | 1.60 | 0.90 | 56% |
| 9 | Constr of Cement Concrete Roads | 12 | 0 | 11 | 0 | 0.15 | 0.09 | 57% |
| 10 | Construction of Recharge Pits | 11 | 0 | 8 | 0 | 0.02 | 0.01 | 53% |
| 11 | Plantation | 11 | 0 | 5 | 1 | 0.48 | 0.39 | 81% |
| 12 | Construction of Tank | 9 | 2 | 1 | 0 | 1.12 | 0.99 | 89% |
| 13 | Construction of Toilets | 8 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 14 | Terracing | 3 | 0 | 3 | 0 | 0.42 | 0.39 | 93% |
| 15 | Land Development | 3 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 16 | Construction of Play field | 2 | 0 | 1 | 0 | 0.00 | 0.01 | 0% |
| 17 | Construction of Embankment | 2 | 0 | 2 | 0 | 0.24 | 0.16 | 67% |
| 18 | Constr of Aganwadi | 2 | 0 | 1 | 0 | 0.02 | 0.02 | 83% |
| 19 | Bio-Fertilizer | 1 | 0 | 1 | 0 | 0.03 | 0.02 | 84% |
| 20 | Repair & maint of Water Harvesting Structures | 1 | 0 | 1 | 0 | 0.09 | 0.05 | 50% |
| 21 | Constr of Gabion | 1 | 0 | 1 | 0 | 0.15 | 0.14 | 95% |
| 22 | Construction of Percolation Tank | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 23 | Construction of Crematorium | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 98% |
| Total | 332 | 12 | 175 | 5 | 13.77 | 10.49 |