| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 35 | 2 | 21 | 0 | 0.06 | 0.05 | 81% |
| 2 | Construction of Tank | 28 | 7 | 9 | 10 | 2.53 | 1.87 | 74% |
| 3 | Land Development | 19 | 0 | 16 | 2 | 0.11 | 0.02 | 19% |
| 4 | Construction of Road and Culvert | 14 | 1 | 4 | 5 | 1.21 | 0.55 | 46% |
| 5 | Repair & Maint of Bund | 12 | 0 | 0 | 12 | 0.04 | 0.00 | 0% |
| 6 | Constr of Cement Concrete Roads | 12 | 0 | 9 | 2 | 0.31 | 0.07 | 22% |
| 7 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 7 | 0 | 2 | 5 | 0.24 | 0.14 | 59% |
| 8 | Plantation | 7 | 0 | 2 | 5 | 0.13 | 0.00 | 3% |
| 9 | Farm Pond | 5 | 3 | 0 | 0 | 0.04 | 0.01 | 26% |
| 10 | Cattle Shed | 5 | 0 | 4 | 0 | 0.04 | 0.03 | 84% |
| 11 | Construction of Trench | 3 | 0 | 1 | 1 | 0.03 | 0.01 | 45% |
| 12 | Construction of Crematorium | 3 | 0 | 2 | 1 | 0.13 | 0.11 | 87% |
| 13 | Repair & maint of Pond/ Tank | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 14 | Construction of Check Dam/Stop Dam | 2 | 0 | 0 | 1 | 0.01 | 0.00 | 0% |
| 15 | Constr of GP Bhawan | 2 | 0 | 2 | 0 | 0.04 | 0.04 | 106% |
| 16 | Solid and Liquid Waste Management | 2 | 0 | 0 | 2 | 0.01 | 0.00 | 0% |
| 17 | Construction of Percolation Tank | 1 | 0 | 1 | 0 | 0.08 | 0.08 | 98% |
| 18 | Works for Flood Control and Protection | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 19 | Construction of Play field | 1 | 0 | 1 | 0 | 0.04 | 0.02 | 61% |
| Total | 161 | 13 | 74 | 49 | 5.04 | 3.01 |