| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Land Development | 51 | 0 | 47 | 1 | 0.31 | 0.19 | 61% |
| 2 | Construction of Bund | 45 | 0 | 34 | 10 | 0.22 | 0.19 | 85% |
| 3 | Rural Housing | 36 | 8 | 26 | 0 | 0.07 | 0.05 | 82% |
| 4 | Construction of Trench | 18 | 0 | 4 | 3 | 0.33 | 0.32 | 96% |
| 5 | Plantation | 16 | 0 | 5 | 7 | 0.65 | 0.47 | 72% |
| 6 | Construction of Road and Culvert | 13 | 0 | 5 | 0 | 1.40 | 1.08 | 77% |
| 7 | Constr of Cement Concrete Roads | 12 | 1 | 6 | 0 | 0.14 | 0.07 | 48% |
| 8 | Cattle Shed | 11 | 0 | 8 | 0 | 0.09 | 0.07 | 80% |
| 9 | Construction of NADEP/Vermi Compost Pit | 11 | 0 | 0 | 1 | 1.24 | 0.00 | 0% |
| 10 | Farm Pond | 10 | 0 | 0 | 0 | 0.23 | 0.16 | 71% |
| 11 | Construction of Check Dam/Stop Dam | 6 | 2 | 2 | 1 | 0.36 | 0.30 | 83% |
| 12 | Construction of Tank | 5 | 1 | 1 | 0 | 0.81 | 0.11 | 14% |
| 13 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 4 | 0 | 1 | 0 | 0.16 | 0.13 | 83% |
| 14 | Repair & maint of Pond/ Tank | 3 | 0 | 1 | 1 | 0.14 | 0.03 | 23% |
| 15 | Terracing | 3 | 0 | 1 | 0 | 0.01 | 0.01 | 97% |
| 16 | Repair & Maint of Bund | 2 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 17 | Well Recharge | 2 | 0 | 0 | 0 | 0.01 | 0.00 | 16% |
| 18 | Construction of Crematorium | 2 | 0 | 2 | 0 | 0.17 | 0.16 | 95% |
| 19 | Construction of Percolation Tank | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 20 | Community Sanitary Complex | 2 | 0 | 2 | 0 | 0.01 | 0.01 | 100% |
| 21 | Repair & maint of Water Harvesting Structures | 2 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 22 | Works for Flood Control and Protection | 1 | 0 | 0 | 0 | 0.10 | 0.01 | 11% |
| 23 | Constr of Gabion | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 24 | Constr of GP Bhawan | 1 | 1 | 0 | 0 | 0.10 | 0.07 | 67% |
| 25 | Construction of Canal | 1 | 0 | 0 | 1 | 0.03 | 0.00 | 0% |
| 26 | Construction of Fish Drying Infrastructure | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 27 | Construction of Play field | 1 | 0 | 1 | 0 | 0.03 | 0.03 | 98% |
| 28 | Construction of Recharge Pits | 1 | 0 | 1 | 0 | 0.15 | 0.13 | 90% |
| 29 | Roof Water Harvesting on gov/panchayat bldg | 1 | 0 | 1 | 0 | 0.14 | 0.14 | 99% |
| 30 | Solid and Liquid Waste Management | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 53% |
| 31 | Boulder Check/Gully Plug | 1 | 0 | 0 | 0 | 0.15 | 0.14 | 93% |
| Total | 266 | 13 | 149 | 28 | 7.05 | 3.87 |