| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 123 | 34 | 65 | 1 | 25.68 | 17.12 | 67% |
| 2 | Cattle Shed | 53 | 0 | 46 | 0 | 40.17 | 14.71 | 37% |
| 3 | Constr of Cement Concrete Roads | 36 | 0 | 25 | 5 | 20.46 | 31.91 | 156% |
| 4 | Construction of NADEP/Vermi Compost Pit | 24 | 0 | 10 | 11 | 15.21 | 4.27 | 28% |
| 5 | Construction of Tank | 16 | 0 | 11 | 4 | 14.39 | 6.29 | 44% |
| 6 | Farm Pond | 14 | 0 | 8 | 0 | 13.13 | 9.57 | 73% |
| 7 | Repair & maint of Water Harvesting Structures | 13 | 0 | 0 | 13 | 1.44 | 0.00 | 0% |
| 8 | Construction of Road and Culvert | 13 | 1 | 12 | 0 | 60.35 | 8.95 | 15% |
| 9 | Solid and Liquid Waste Management | 10 | 0 | 6 | 2 | 17.55 | 13.88 | 79% |
| 10 | Plantation | 9 | 1 | 6 | 2 | 22.69 | 5.59 | 25% |
| 11 | Works for Flood Control and Protection | 8 | 0 | 6 | 2 | 19.51 | 15.99 | 82% |
| 12 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 5 | 2 | 0 | 1 | 5.53 | 1.93 | 35% |
| 13 | Well Recharge | 5 | 0 | 0 | 3 | 1.00 | 0.47 | 47% |
| 14 | Construction of Check Dam/Stop Dam | 3 | 0 | 2 | 1 | 0.97 | 0.61 | 63% |
| 15 | Construction of Bund | 3 | 0 | 1 | 2 | 11.62 | 7.83 | 67% |
| 16 | Constr of GP Bhawan | 3 | 0 | 3 | 0 | 6.31 | 4.82 | 76% |
| 17 | Construction of Percolation Tank | 1 | 0 | 1 | 0 | 1.09 | 0.80 | 73% |
| 18 | Repair & maint of Pond/ Tank | 1 | 1 | 0 | 0 | 3.38 | 0.95 | 28% |
| 19 | Construction of Toilets | 1 | 1 | 0 | 0 | 0.61 | 0.09 | 14% |
| 20 | Goat Shelter | 1 | 0 | 0 | 0 | 0.69 | 0.00 | 0% |
| 21 | Construction of Play field | 1 | 0 | 1 | 0 | 1.86 | 0.80 | 43% |
| 22 | Construction of Trench | 1 | 0 | 1 | 0 | 1.39 | 1.09 | 78% |
| Total | 344 | 40 | 204 | 47 | 285.05 | 147.69 |