| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 107 | 2 | 101 | 2 | 0.20 | 0.19 | 93% |
| 2 | Land Development | 66 | 0 | 40 | 1 | 2.03 | 0.15 | 8% |
| 3 | Construction of NADEP/Vermi Compost Pit | 63 | 0 | 26 | 35 | 0.08 | 0.05 | 59% |
| 4 | Construction of Toilets | 39 | 0 | 24 | 4 | 0.03 | 0.01 | 21% |
| 5 | Constr of Cement Concrete Roads | 37 | 3 | 21 | 10 | 0.24 | 0.15 | 63% |
| 6 | Construction of Bund | 30 | 0 | 4 | 11 | 0.14 | 0.12 | 80% |
| 7 | Construction of Check Dam/Stop Dam | 26 | 0 | 23 | 2 | 0.26 | 0.23 | 86% |
| 8 | Farm Pond | 24 | 2 | 19 | 2 | 0.34 | 0.21 | 62% |
| 9 | Construction of Road and Culvert | 23 | 0 | 19 | 0 | 1.14 | 0.82 | 72% |
| 10 | Well Recharge | 21 | 0 | 18 | 2 | 0.20 | 0.12 | 57% |
| 11 | Construction of Tank | 18 | 2 | 6 | 7 | 0.28 | 0.18 | 66% |
| 12 | Plantation | 14 | 1 | 5 | 5 | 0.39 | 0.09 | 22% |
| 13 | Solid and Liquid Waste Management | 12 | 0 | 7 | 4 | 0.24 | 0.21 | 90% |
| 14 | Construction of Well | 10 | 0 | 10 | 0 | 0.32 | 0.24 | 75% |
| 15 | Construction of Crematorium | 7 | 1 | 2 | 0 | 0.12 | 0.10 | 89% |
| 16 | Construction of Trench | 6 | 0 | 6 | 0 | 0.14 | 0.06 | 47% |
| 17 | Repair & maint of Pond/ Tank | 5 | 0 | 0 | 5 | 0.00 | 0.00 | 0% |
| 18 | Constr of Gabion | 4 | 0 | 0 | 4 | 0.00 | 0.00 | 0% |
| 19 | Boulder Check/Gully Plug | 4 | 0 | 3 | 0 | 0.08 | 0.06 | 70% |
| 20 | Constr of GP Bhawan | 2 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 21 | Cattle Shed | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 22 | Renovation of traditional water bodies | 2 | 0 | 1 | 1 | 0.03 | 0.02 | 92% |
| 23 | Roof Water Harvesting on gov/panchayat bldg | 2 | 0 | 2 | 0 | 0.00 | 0.00 | 96% |
| 24 | Repair & maint of Road | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 25 | Terracing | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 26 | Construction of Percolation Tank | 1 | 0 | 1 | 0 | 0.04 | 0.04 | 100% |
| Total | 527 | 11 | 338 | 98 | 6.30 | 3.04 |