| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 142 | 8 | 128 | 0 | 0.25 | 0.22 | 89% |
| 2 | Constr of Cement Concrete Roads | 27 | 0 | 16 | 1 | 0.23 | 0.16 | 71% |
| 3 | Goat Shelter | 26 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 4 | Construction of Road and Culvert | 21 | 0 | 16 | 2 | 1.01 | 0.44 | 44% |
| 5 | Land Development | 18 | 0 | 14 | 1 | 0.21 | 0.10 | 49% |
| 6 | Construction of Bund | 14 | 0 | 2 | 0 | 0.04 | 0.00 | 11% |
| 7 | Plantation | 13 | 4 | 6 | 1 | 0.35 | 0.13 | 37% |
| 8 | Cattle Shed | 9 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 9 | Poultry Shelter | 8 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 10 | Works for Flood Control and Protection | 4 | 0 | 0 | 0 | 0.13 | 0.10 | 77% |
| 11 | Renovation of traditional water bodies | 4 | 0 | 2 | 0 | 0.09 | 0.00 | 3% |
| 12 | Repair & Maint of Check Dam/Stop Dam | 4 | 0 | 0 | 3 | 0.31 | 0.00 | 0% |
| 13 | Farm Pond | 3 | 0 | 0 | 1 | 0.00 | 0.00 | 82% |
| 14 | Construction of Crematorium | 3 | 0 | 3 | 0 | 0.02 | 0.00 | 19% |
| 15 | Solid and Liquid Waste Management | 3 | 0 | 1 | 2 | 0.02 | 0.01 | 52% |
| 16 | Construction of Tank | 3 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 17 | Construction of Well | 2 | 0 | 2 | 0 | 0.08 | 0.05 | 69% |
| 18 | Deepening / Desilting of Flood Channels | 2 | 0 | 2 | 0 | 0.04 | 0.02 | 44% |
| 19 | Construction of NADEP/Vermi Compost Pit | 2 | 0 | 2 | 0 | 0.01 | 0.01 | 82% |
| 20 | Well Recharge | 2 | 0 | 2 | 0 | 0.00 | 0.00 | 98% |
| 21 | Constr of Compound wall | 2 | 0 | 2 | 0 | 0.01 | 0.01 | 100% |
| 22 | Culvert | 2 | 0 | 2 | 0 | 0.01 | 0.01 | 92% |
| 23 | Construction of Check Dam/Stop Dam | 1 | 0 | 1 | 0 | 0.02 | 0.01 | 61% |
| 24 | Underground Dyke for Ground Water Recharge | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 25 | Constr of Aganwadi | 1 | 0 | 0 | 0 | 0.01 | 0.00 | 0% |
| 26 | Construction of Recharge Pits | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 100% |
| Total | 318 | 12 | 202 | 12 | 2.84 | 1.30 |