| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 84 | 5 | 57 | 0 | 14.76 | 11.40 | 77% |
| 2 | Farm Pond | 47 | 0 | 8 | 0 | 16.42 | 5.71 | 35% |
| 3 | Terracing | 36 | 0 | 6 | 27 | 5.71 | 1.90 | 33% |
| 4 | Constr of Cement Concrete Roads | 28 | 1 | 18 | 5 | 30.32 | 17.80 | 59% |
| 5 | Plantation | 13 | 0 | 3 | 6 | 20.36 | 2.49 | 12% |
| 6 | Construction of Road and Culvert | 9 | 0 | 6 | 1 | 50.20 | 34.78 | 69% |
| 7 | Construction of Bund | 9 | 0 | 1 | 6 | 0.68 | 0.09 | 14% |
| 8 | Construction of Recharge Pits | 8 | 0 | 0 | 8 | 0.43 | 0.00 | 0% |
| 9 | Construction of Check Dam/Stop Dam | 6 | 0 | 4 | 0 | 10.43 | 6.18 | 59% |
| 10 | Land Development | 6 | 0 | 5 | 0 | 5.73 | 4.62 | 81% |
| 11 | Solid and Liquid Waste Management | 5 | 1 | 2 | 2 | 1.32 | 1.11 | 84% |
| 12 | Construction of Well | 3 | 0 | 3 | 0 | 6.51 | 4.26 | 65% |
| 13 | Constr of Aganwadi | 3 | 1 | 0 | 1 | 6.70 | 2.44 | 36% |
| 14 | Works for Flood Control and Protection | 2 | 0 | 0 | 0 | 0.49 | 0.16 | 33% |
| 15 | Construction of NADEP/Vermi Compost Pit | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 16 | Poultry Shelter | 2 | 0 | 0 | 0 | 1.16 | 0.00 | 0% |
| 17 | Repair & Maint of Community infrastructure | 2 | 0 | 2 | 0 | 2.31 | 2.08 | 90% |
| 18 | Well Recharge | 2 | 0 | 0 | 0 | 0.52 | 0.18 | 34% |
| 19 | Cattle Shed | 2 | 0 | 2 | 0 | 1.04 | 0.67 | 64% |
| 20 | Constr of GP Bhawan | 1 | 0 | 0 | 1 | 5.80 | 0.00 | 0% |
| 21 | Construction of Trench | 1 | 0 | 1 | 0 | 1.25 | 0.68 | 54% |
| 22 | Construction of Tank | 1 | 0 | 0 | 1 | 3.29 | 0.00 | 0% |
| 23 | Goat Shelter | 1 | 0 | 0 | 0 | 0.53 | 0.00 | 0% |
| 24 | Nursery Development | 1 | 0 | 0 | 1 | 0.17 | 0.00 | 0% |
| 25 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 0 | 0.29 | 0.00 | 0% |
| 26 | Strengthening of Embankment | 1 | 0 | 1 | 0 | 2.25 | 2.16 | 96% |
| Total | 276 | 8 | 119 | 59 | 188.66 | 98.71 |