| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 126 | 0 | 112 | 1 | 21.82 | 18.10 | 83% |
| 2 | Construction of Toilets | 21 | 0 | 1 | 20 | 1.92 | 0.12 | 6% |
| 3 | Land Development | 18 | 0 | 6 | 1 | 8.09 | 3.64 | 45% |
| 4 | Solid and Liquid Waste Management | 14 | 0 | 0 | 14 | 1.12 | 0.00 | 0% |
| 5 | Construction of Road and Culvert | 14 | 1 | 11 | 0 | 58.66 | 34.30 | 59% |
| 6 | Cattle Shed | 12 | 0 | 0 | 12 | 0.00 | 0.00 | 0% |
| 7 | Constr of Cement Concrete Roads | 11 | 1 | 4 | 4 | 10.23 | 4.74 | 46% |
| 8 | Construction of Well | 10 | 0 | 4 | 2 | 7.06 | 7.91 | 112% |
| 9 | Plantation | 10 | 0 | 4 | 4 | 14.63 | 0.30 | 2% |
| 10 | Construction of NADEP/Vermi Compost Pit | 6 | 0 | 0 | 6 | 0.23 | 0.00 | 0% |
| 11 | Farm Pond | 5 | 2 | 0 | 1 | 2.95 | 0.32 | 11% |
| 12 | Renovation of traditional water bodies | 5 | 0 | 2 | 0 | 0.23 | 3.68 | 1601% |
| 13 | Construction of Percolation Tank | 3 | 0 | 3 | 0 | 0.37 | 0.35 | 95% |
| 14 | Construction of Check Dam/Stop Dam | 3 | 0 | 2 | 0 | 4.75 | 2.19 | 46% |
| 15 | Construction of Trench | 2 | 0 | 2 | 0 | 3.06 | 0.26 | 9% |
| 16 | Repair & maint of Pond/ Tank | 2 | 0 | 1 | 1 | 3.33 | 1.91 | 57% |
| 17 | Constr of GP Bhawan | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 18 | Constr of Gabion | 2 | 0 | 2 | 0 | 4.95 | 1.85 | 38% |
| 19 | Construction of Bund | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 20 | Works for Flood Control and Protection | 1 | 0 | 0 | 0 | 1.28 | 0.00 | 0% |
| 21 | Poultry Shelter | 1 | 0 | 1 | 0 | 0.44 | 0.01 | 1% |
| 22 | Goat Shelter | 1 | 0 | 1 | 0 | 0.44 | 0.01 | 1% |
| Total | 270 | 4 | 156 | 69 | 145.56 | 79.69 |