| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 375 | 99 | 163 | 1 | 84.21 | 57.01 | 68% |
| 2 | Land Development | 93 | 0 | 62 | 19 | 12.84 | 18.18 | 142% |
| 3 | Farm Pond | 45 | 0 | 36 | 1 | 11.84 | 13.56 | 115% |
| 4 | Cattle Shed | 35 | 0 | 13 | 15 | 22.03 | 11.43 | 52% |
| 5 | Constr of Cement Concrete Roads | 35 | 4 | 17 | 3 | 26.20 | 44.26 | 169% |
| 6 | Construction of Road and Culvert | 31 | 0 | 17 | 1 | 99.68 | 70.17 | 70% |
| 7 | Construction of Check Dam/Stop Dam | 31 | 0 | 17 | 1 | 11.14 | 19.28 | 173% |
| 8 | Construction of NADEP/Vermi Compost Pit | 31 | 2 | 13 | 16 | 3.92 | 0.79 | 20% |
| 9 | Plantation | 14 | 2 | 5 | 1 | 37.18 | 12.89 | 35% |
| 10 | Renovation of traditional water bodies | 14 | 0 | 11 | 2 | 22.49 | 24.83 | 110% |
| 11 | Construction of Well | 8 | 0 | 3 | 1 | 16.00 | 6.97 | 44% |
| 12 | Construction of Bund | 7 | 0 | 5 | 2 | 1.38 | 0.82 | 60% |
| 13 | Works for Flood Control and Protection | 5 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 14 | Constr of Aganwadi | 4 | 1 | 2 | 0 | 10.05 | 1.49 | 15% |
| 15 | Culvert | 3 | 0 | 2 | 0 | 2.12 | 1.37 | 65% |
| 16 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 2 | 0 | 1 | 0 | 8.81 | 5.53 | 63% |
| 17 | Construction of Crematorium | 2 | 0 | 1 | 0 | 7.62 | 3.45 | 45% |
| 18 | Repair & maint of Pond/ Tank | 2 | 0 | 1 | 0 | 8.62 | 3.07 | 36% |
| 19 | Terracing | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 20 | Construction of Trench | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 21 | Repair & Maint of Check Dam/Stop Dam | 1 | 0 | 0 | 0 | 9.49 | 6.40 | 67% |
| 22 | Well Recharge | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 23 | Community Sanitary Complex | 1 | 0 | 1 | 0 | 0.13 | 0.13 | 97% |
| 24 | Goat Shelter | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 25 | Boulder Check/Gully Plug | 1 | 0 | 0 | 1 | 0.43 | 0.00 | 0% |
| 26 | Constr of GP Bhawan | 1 | 0 | 1 | 0 | 7.25 | 0.75 | 10% |
| Total | 746 | 108 | 371 | 66 | 403.41 | 302.37 |