| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction of Tank | 7 | 1 | 0 | 0 | 40.14 | 0.18 | 0% |
| 2 | Construction of Recharge Pits | 6 | 0 | 0 | 0 | 2.14 | 0.00 | 0% |
| 3 | Rural Housing | 3 | 1 | 0 | 0 | 0.82 | 0.00 | 0% |
| 4 | Constr of Gabion | 3 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 5 | Boulder Check/Gully Plug | 2 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 6 | (uncategorised) | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 7 | Construction of Check Dam/Stop Dam | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 8 | Construction of Road and Culvert | 1 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 9 | Construction of Trench | 1 | 0 | 0 | 0 | 3.04 | 0.00 | 0% |
| Total | 25 | 2 | 0 | 0 | 46.14 | 0.18 |