| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 167 | 22 | 109 | 0 | 0.37 | 0.28 | 76% |
| 2 | Farm Pond | 45 | 0 | 24 | 3 | 1.47 | 1.20 | 82% |
| 3 | Land Development | 34 | 0 | 28 | 2 | 0.07 | 0.05 | 69% |
| 4 | Construction of Well | 30 | 2 | 22 | 4 | 0.43 | 0.36 | 83% |
| 5 | Construction of Road and Culvert | 25 | 0 | 16 | 6 | 0.97 | 0.65 | 67% |
| 6 | Constr of Cement Concrete Roads | 24 | 0 | 19 | 2 | 0.19 | 0.14 | 75% |
| 7 | Plantation | 18 | 0 | 14 | 0 | 0.47 | 0.34 | 71% |
| 8 | Well Recharge | 13 | 0 | 9 | 0 | 0.03 | 0.03 | 89% |
| 9 | Underground Dyke for Ground Water Recharge | 13 | 0 | 3 | 2 | 0.03 | 0.03 | 96% |
| 10 | Construction of Toilets | 10 | 0 | 10 | 0 | 0.01 | 0.01 | 99% |
| 11 | Construction of Trench | 10 | 0 | 9 | 0 | 0.27 | 0.17 | 61% |
| 12 | Construction of Check Dam/Stop Dam | 9 | 0 | 6 | 1 | 0.25 | 0.19 | 75% |
| 13 | Construction of Percolation Tank | 8 | 0 | 4 | 1 | 0.08 | 0.08 | 94% |
| 14 | Construction of Bund | 7 | 0 | 3 | 0 | 0.01 | 0.01 | 59% |
| 15 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 7 | 0 | 5 | 2 | 0.37 | 0.33 | 91% |
| 16 | Construction of Embankment | 6 | 0 | 4 | 2 | 0.34 | 0.31 | 91% |
| 17 | Construction of NADEP/Vermi Compost Pit | 5 | 0 | 2 | 1 | 0.01 | 0.01 | 73% |
| 18 | Solid and Liquid Waste Management | 5 | 0 | 3 | 2 | 0.01 | 0.01 | 91% |
| 19 | Cattle Shed | 4 | 0 | 4 | 0 | 0.04 | 0.03 | 72% |
| 20 | Renovation of traditional water bodies | 3 | 0 | 3 | 0 | 0.06 | 0.00 | 1% |
| 21 | Culvert | 2 | 0 | 1 | 0 | 0.05 | 0.00 | 0% |
| 22 | Construction of Tank | 1 | 0 | 1 | 0 | 0.01 | 0.01 | 100% |
| 23 | Constr of Kitchen Shed | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 24 | Constr of Aganwadi | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 100% |
| 25 | Works for Flood Control and Protection | 1 | 0 | 1 | 0 | 0.13 | 0.13 | 98% |
| Total | 449 | 24 | 301 | 29 | 5.72 | 4.38 |