| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 298 | 21 | 257 | 0 | 0.56 | 0.52 | 92% |
| 2 | Construction of Well | 86 | 0 | 49 | 17 | 0.89 | 0.51 | 57% |
| 3 | Construction of Trench | 23 | 0 | 18 | 0 | 0.79 | 0.64 | 81% |
| 4 | Farm Pond | 23 | 0 | 16 | 0 | 0.08 | 0.05 | 59% |
| 5 | Construction of Check Dam/Stop Dam | 22 | 0 | 13 | 3 | 1.37 | 0.70 | 51% |
| 6 | Plantation | 20 | 4 | 13 | 1 | 0.57 | 0.10 | 18% |
| 7 | Construction of Percolation Tank | 20 | 0 | 16 | 0 | 0.57 | 0.45 | 80% |
| 8 | Construction of Bund | 18 | 0 | 8 | 10 | 0.36 | 0.24 | 66% |
| 9 | Well Recharge | 14 | 0 | 9 | 1 | 0.04 | 0.03 | 76% |
| 10 | Construction of Road and Culvert | 9 | 0 | 7 | 1 | 0.64 | 0.47 | 74% |
| 11 | Constr of Gabion | 8 | 0 | 6 | 1 | 0.22 | 0.18 | 84% |
| 12 | Solid and Liquid Waste Management | 8 | 0 | 1 | 6 | 0.03 | 0.01 | 44% |
| 13 | Construction of NADEP/Vermi Compost Pit | 5 | 0 | 3 | 2 | 0.03 | 0.00 | 14% |
| 14 | Constr of Cement Concrete Roads | 5 | 0 | 4 | 0 | 0.07 | 0.03 | 37% |
| 15 | Boulder Check/Gully Plug | 4 | 0 | 4 | 0 | 0.05 | 0.04 | 82% |
| 16 | Construction of Crematorium | 3 | 0 | 0 | 0 | 0.05 | 0.00 | 0% |
| 17 | Renovation of traditional water bodies | 2 | 0 | 1 | 0 | 0.04 | 0.01 | 13% |
| 18 | Repair & maint of Percolation Tank | 2 | 0 | 0 | 0 | 0.07 | 0.06 | 86% |
| 19 | Repair & maint of Pond/ Tank | 2 | 1 | 1 | 0 | 0.17 | 0.04 | 21% |
| 20 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| 21 | Constr of GP Bhawan | 1 | 0 | 1 | 0 | 0.05 | 0.05 | 98% |
| 22 | Construction of Embankment | 1 | 0 | 1 | 0 | 0.03 | 0.02 | 86% |
| 23 | Constr of Kitchen Shed | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 77% |
| 24 | Repair & Maint of Check Dam/Stop Dam | 1 | 0 | 1 | 0 | 0.05 | 0.04 | 91% |
| 25 | Roof Water Harvesting on gov/panchayat bldg | 1 | 0 | 1 | 0 | 0.00 | 0.00 | 96% |
| Total | 578 | 26 | 431 | 43 | 6.72 | 4.20 |