| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 244 | 5 | 218 | 1 | 0.43 | 0.38 | 90% |
| 2 | Construction of Well | 74 | 1 | 42 | 14 | 1.66 | 1.04 | 62% |
| 3 | Cattle Shed | 26 | 0 | 14 | 0 | 0.29 | 0.08 | 27% |
| 4 | Land Development | 22 | 0 | 15 | 2 | 0.37 | 0.24 | 64% |
| 5 | Construction of Check Dam/Stop Dam | 17 | 0 | 15 | 1 | 0.07 | 0.03 | 41% |
| 6 | Constr of Cement Concrete Roads | 16 | 0 | 10 | 2 | 0.25 | 0.20 | 78% |
| 7 | Construction of Road and Culvert | 15 | 0 | 5 | 3 | 0.63 | 0.32 | 51% |
| 8 | Farm Pond | 14 | 0 | 1 | 0 | 9.62 | 0.01 | 0% |
| 9 | Construction of Tank | 14 | 1 | 0 | 0 | 0.10 | 0.09 | 86% |
| 10 | Construction of Crematorium | 10 | 0 | 5 | 3 | 0.17 | 0.07 | 43% |
| 11 | Plantation | 7 | 0 | 5 | 1 | 0.23 | 0.10 | 43% |
| 12 | Well Recharge | 5 | 0 | 3 | 0 | 0.11 | 0.09 | 81% |
| 13 | Construction of Play field | 4 | 0 | 0 | 2 | 0.07 | 0.00 | 0% |
| 14 | Construction of Percolation Tank | 4 | 1 | 2 | 0 | 0.14 | 0.10 | 76% |
| 15 | Constr of Compound wall | 2 | 0 | 2 | 0 | 0.17 | 0.16 | 97% |
| 16 | Construction of Trench | 2 | 0 | 1 | 0 | 0.06 | 0.03 | 49% |
| 17 | Renovation of traditional water bodies | 2 | 0 | 1 | 0 | 0.10 | 0.01 | 6% |
| 18 | Solid and Liquid Waste Management | 2 | 0 | 1 | 0 | 0.02 | 0.02 | 86% |
| 19 | Repair & maint of Pond/ Tank | 1 | 0 | 0 | 0 | 0.09 | 0.08 | 90% |
| 20 | Repair & maint of Road | 1 | 0 | 1 | 0 | 0.03 | 0.03 | 98% |
| 21 | Constr of Gabion | 1 | 0 | 1 | 0 | 0.02 | 0.02 | 91% |
| 22 | Constr of GP Bhawan | 1 | 0 | 1 | 0 | 0.13 | 0.10 | 77% |
| 23 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0 | 1 | 0 | 0.04 | 0.03 | 85% |
| Total | 485 | 8 | 344 | 29 | 14.80 | 3.22 |