| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 108 | 10 | 97 | 0 | 20.98 | 17.75 | 85% |
| 2 | Construction of Well | 61 | 0 | 27 | 19 | 96.60 | 83.88 | 87% |
| 3 | Farm Pond | 24 | 0 | 13 | 1 | 43.69 | 21.84 | 50% |
| 4 | Construction of Road and Culvert | 24 | 0 | 11 | 8 | 65.70 | 30.54 | 47% |
| 5 | Constr of Cement Concrete Roads | 23 | 0 | 18 | 1 | 28.74 | 19.36 | 67% |
| 6 | Construction of Check Dam/Stop Dam | 21 | 0 | 12 | 0 | 25.78 | 10.13 | 39% |
| 7 | Cattle Shed | 14 | 0 | 11 | 0 | 16.52 | 7.09 | 43% |
| 8 | Solid and Liquid Waste Management | 14 | 0 | 0 | 14 | 0.00 | 0.00 | 0% |
| 9 | Plantation | 12 | 1 | 6 | 1 | 29.70 | 10.91 | 37% |
| 10 | Land Development | 10 | 0 | 4 | 1 | 13.62 | 12.14 | 89% |
| 11 | Construction of Toilets | 8 | 0 | 0 | 8 | 0.96 | 0.00 | 0% |
| 12 | Well Recharge | 7 | 0 | 7 | 0 | 1.81 | 1.71 | 94% |
| 13 | Construction of Recharge Pits | 7 | 0 | 1 | 5 | 0.13 | 0.09 | 66% |
| 14 | Constr of Aganwadi | 3 | 0 | 2 | 1 | 4.18 | 2.37 | 57% |
| 15 | Community Sanitary Complex | 3 | 0 | 1 | 0 | 0.44 | 0.40 | 91% |
| 16 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 17 | Construction of Play field | 2 | 0 | 0 | 2 | 1.86 | 0.00 | 0% |
| 18 | Repair & maint of Pond/ Tank | 2 | 0 | 1 | 0 | 10.60 | 10.33 | 98% |
| 19 | Strengthening of Embankment | 2 | 0 | 1 | 0 | 9.84 | 4.44 | 45% |
| 20 | Construction of Trench | 1 | 0 | 1 | 0 | 2.74 | 0.98 | 36% |
| 21 | Constr of Gabion | 1 | 0 | 0 | 0 | 1.58 | 0.00 | 0% |
| 22 | Deepening / Desilting of Flood Channels | 1 | 0 | 0 | 0 | 4.93 | 0.00 | 0% |
| 23 | Construction of NADEP/Vermi Compost Pit | 1 | 0 | 0 | 1 | 0.10 | 0.00 | 0% |
| 24 | Construction of Crematorium | 1 | 0 | 1 | 0 | 1.80 | 1.80 | 100% |
| Total | 352 | 11 | 214 | 64 | 382.32 | 235.74 |