| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 133 | 11 | 118 | 0 | 23.64 | 21.59 | 91% |
| 2 | Constr of Cement Concrete Roads | 34 | 3 | 21 | 9 | 11.87 | 9.91 | 84% |
| 3 | Solid and Liquid Waste Management | 18 | 2 | 5 | 9 | 3.65 | 1.68 | 46% |
| 4 | Construction of Toilets | 10 | 0 | 6 | 1 | 0.31 | 0.25 | 80% |
| 5 | Plantation | 8 | 0 | 7 | 1 | 22.73 | 2.34 | 10% |
| 6 | Construction of NADEP/Vermi Compost Pit | 6 | 2 | 2 | 2 | 7.64 | 1.91 | 25% |
| 7 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 6 | 0 | 2 | 4 | 4.59 | 1.29 | 28% |
| 8 | Land Development | 4 | 0 | 3 | 0 | 0.61 | 0.04 | 7% |
| 9 | Well Recharge | 4 | 0 | 1 | 1 | 0.52 | 0.07 | 14% |
| 10 | Construction of Road and Culvert | 4 | 0 | 2 | 2 | 9.46 | 0.05 | 1% |
| 11 | Farm Pond | 4 | 0 | 1 | 0 | 5.99 | 2.50 | 42% |
| 12 | Works for Flood Control and Protection | 3 | 0 | 2 | 1 | 1.68 | 1.09 | 65% |
| 13 | Constr of GP Bhawan | 3 | 0 | 3 | 0 | 6.76 | 4.22 | 62% |
| 14 | Construction of Percolation Tank | 3 | 0 | 3 | 0 | 2.34 | 1.37 | 59% |
| 15 | Construction of Play field | 3 | 0 | 3 | 0 | 7.77 | 0.98 | 13% |
| 16 | Cattle Shed | 2 | 0 | 2 | 0 | 1.76 | 1.54 | 88% |
| 17 | Construction of Trench | 2 | 0 | 1 | 0 | 0.94 | 0.54 | 57% |
| 18 | Repair & Maint of Community infrastructure | 2 | 0 | 2 | 0 | 0.76 | 0.61 | 81% |
| 19 | Repair & maint of Pond/ Tank | 2 | 0 | 0 | 2 | 0.00 | 0.00 | 0% |
| 20 | Roof Water Harvesting on gov/panchayat bldg | 2 | 0 | 1 | 1 | 0.93 | 0.69 | 75% |
| 21 | Construction of Crematorium | 2 | 0 | 2 | 0 | 3.60 | 1.66 | 46% |
| 22 | Construction of Check Dam/Stop Dam | 2 | 0 | 1 | 1 | 0.76 | 0.02 | 3% |
| 23 | Construction of Tank | 1 | 0 | 1 | 0 | 0.86 | 0.74 | 86% |
| 24 | Grass Land Development | 1 | 0 | 0 | 1 | 0.00 | 0.00 | 0% |
| Total | 259 | 18 | 189 | 35 | 119.17 | 55.10 |