MGNREGA Works Dashboard
Admin login

Overall

Rollup last refreshed: 2026-07-11 02:05:34.314168 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 735 6 690 5 1.28 1.19
93%
2 Constr of Cement Concrete Roads 80 3 37 29 0.43 0.28
64%
3 Plantation 42 7 19 14 0.58 0.06
11%
4 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 34 0 33 1 0.05 0.03
65%
5 Construction of Check Dam/Stop Dam 29 0 28 0 0.03 0.03
92%
6 Construction of NADEP/Vermi Compost Pit 21 1 4 15 0.11 0.02
14%
7 Land Development 20 0 15 5 0.10 0.06
59%
8 Construction of Percolation Tank 11 0 10 1 0.01 0.01
78%
9 Repair & Maint of Community infrastructure 9 0 5 0 0.12 0.02
15%
10 Repair & maint of Road 9 0 7 2 0.04 0.03
81%
11 Constr of Compound wall 8 0 7 0 0.02 0.02
95%
12 Well Recharge 8 0 5 0 0.01 0.00
72%
13 Cattle Shed 5 0 5 0 0.06 0.06
99%
14 Construction of Recharge Pits 5 0 4 1 0.02 0.01
48%
15 Roof Water Harvesting on gov/panchayat bldg 5 0 4 1 0.01 0.00
85%
16 Farm Pond 4 0 1 0 0.01 0.00
76%
17 Construction of Road and Culvert 3 0 2 1 0.04 0.04
96%
18 Constr of GP Bhawan 2 0 1 1 0.00 0.00
49%
19 Solid and Liquid Waste Management 2 0 2 0 0.01 0.00
77%
20 Terracing 2 0 2 0 0.00 0.00
99%
21 Community Sanitary Complex 2 0 2 0 0.01 0.01
72%
22 Construction of Trench 2 0 2 0 0.00 0.00
93%
23 Construction of building/workshed for SHG 1 0 0 1 0.00 0.00
0%
24 Works for Flood Control and Protection 1 0 0 1 0.00 0.00
0%
25 Repair & maint of Pond/ Tank 1 1 0 0 0.01 0.00
3%
Total 1,041 18 885 78 2.93 1.88
All 25 rows (zero-value rows hidden) ⇩ Export to Excel