| Sr. | New Work Type | Total works | Ongoing | Completed | Closed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|---|---|---|
| 1 | Rural Housing | 360 | 15 | 304 | 0 | 0.71 | 0.58 | 82% |
| 2 | Construction of Check Dam/Stop Dam | 202 | 1 | 173 | 0 | 1.22 | 0.58 | 47% |
| 3 | Farm Pond | 119 | 6 | 74 | 9 | 1.55 | 0.89 | 57% |
| 4 | Construction of Trench | 100 | 0 | 91 | 1 | 0.76 | 0.27 | 35% |
| 5 | Land Development | 71 | 0 | 49 | 14 | 0.56 | 0.37 | 66% |
| 6 | Construction of Bund | 61 | 0 | 49 | 1 | 0.61 | 0.41 | 68% |
| 7 | Construction of Well | 32 | 3 | 13 | 7 | 0.88 | 0.29 | 33% |
| 8 | Plantation | 20 | 5 | 6 | 3 | 0.22 | 0.08 | 35% |
| 9 | Constr of Cement Concrete Roads | 15 | 0 | 12 | 1 | 0.09 | 0.06 | 66% |
| 10 | Works for Flood Control and Protection | 15 | 0 | 12 | 0 | 0.30 | 0.19 | 63% |
| 11 | Construction of Road and Culvert | 10 | 0 | 4 | 0 | 0.38 | 0.12 | 31% |
| 12 | Cattle Shed | 9 | 0 | 0 | 9 | 0.00 | 0.00 | 0% |
| 13 | Construction of NADEP/Vermi Compost Pit | 8 | 0 | 5 | 1 | 0.02 | 0.00 | 23% |
| 14 | Repair & maint of Pond/ Tank | 7 | 0 | 1 | 5 | 0.05 | 0.03 | 69% |
| 15 | Well Recharge | 6 | 0 | 0 | 0 | 0.01 | 0.01 | 69% |
| 16 | Construction of Toilets | 6 | 0 | 0 | 0 | 0.00 | 0.00 | 0% |
| 17 | Construction of Crematorium | 3 | 0 | 2 | 1 | 0.05 | 0.04 | 67% |
| 18 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 2 | 0 | 1 | 0 | 0.18 | 0.12 | 65% |
| 19 | Construction of Tank | 2 | 0 | 2 | 0 | 0.09 | 0.04 | 44% |
| 20 | Poultry Shelter | 2 | 0 | 0 | 2 | 0.01 | 0.00 | 0% |
| 21 | Repair & Maint of Check Dam/Stop Dam | 2 | 0 | 1 | 1 | 0.09 | 0.03 | 31% |
| 22 | Boulder Check/Gully Plug | 1 | 0 | 0 | 0 | 0.03 | 0.01 | 39% |
| Total | 1,053 | 30 | 799 | 55 | 7.81 | 4.11 |