Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 367 1 365 1 59.89 58.45
98%
2 Construction of Bund 65 0 47 18 79.69 57.78
73%
3 Land Development 45 0 32 3 8.63 6.32
73%
4 Construction of Well 43 1 12 7 53.50 26.18
49%
5 Construction of Toilets 37 0 28 0 2.94 2.40
82%
6 Constr of Cement Concrete Roads 34 0 24 4 29.80 14.65
49%
7 Plantation 18 0 12 1 63.62 13.79
22%
8 Farm Pond 14 2 7 2 33.70 16.50
49%
9 Solid and Liquid Waste Management 13 0 6 7 0.26 0.06
25%
10 Construction of NADEP/Vermi Compost Pit 11 0 6 4 0.75 0.11
15%
11 Construction of Road and Culvert 10 1 6 3 66.34 45.29
68%
12 Goat Shelter 8 0 2 6 3.73 0.83
22%
13 Construction of Percolation Tank 8 0 7 1 38.73 22.77
59%
14 Well Recharge 8 1 0 0 2.07 1.02
49%
15 Construction of Trench 6 1 4 1 42.31 20.89
49%
16 Cattle Shed 4 0 1 3 2.54 0.59
23%
17 Constr of Compound wall 4 0 2 2 3.81 2.05
54%
18 Construction of Crematorium 3 0 1 2 2.52 2.23
88%
19 Constr of GP Bhawan 2 0 1 1 0.14 0.05
33%
20 Construction of Check Dam/Stop Dam 2 0 1 0 13.43 9.15
68%
21 Terracing 2 0 1 0 13.79 6.14
45%
22 Poultry Shelter 2 0 2 0 1.03 0.93
91%
23 Constr of Kitchen Shed 1 0 1 0 0.20 0.15
76%
24 Repair & Maint of Check Dam/Stop Dam 1 0 1 0 5.82 5.76
99%
25 Repair & maint of Pond/ Tank 1 1 0 0 7.79 5.38
69%
26 Repair & maint of Road 1 0 0 1 1.00 0.00
0%
27 Constr of Food Grain storage 1 0 1 0 9.64 8.76
91%
28 Community Sanitary Complex 1 0 1 0 0.50 0.50
101%
29 Construction of Tank 1 0 0 1 0.00 0.00
0%
30 Works for Flood Control and Protection 1 0 1 0 1.24 1.06
86%
31 Construction of Recharge Pits 1 0 0 1 0.00 0.00
0%
32 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0 0 0 1.24 0.00
0%
33 Construction of Play field 1 0 1 0 9.30 1.41
15%
34 Construction of Embankment 1 0 1 0 14.80 12.31
83%
Total 718 8 574 69 574.76 343.51
All 34 rows (zero-value rows hidden) ⇩ Export to Excel