MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Overall

Rollup last refreshed: 2026-09-16 08:34:45.218851 · figures are real, from work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 222 0 220 0 0.38 0.36
94%
2 Construction of Check Dam/Stop Dam 204 1 120 6 2.34 1.17
50%
3 Construction of Bund 103 0 51 30 0.93 0.64
69%
4 Land Development 71 0 61 3 0.57 0.45
79%
5 Construction of Percolation Tank 45 0 0 0 0.05 0.00
2%
6 Farm Pond 45 0 29 0 0.20 0.11
53%
7 Construction of Trench 42 0 35 7 2.40 2.31
96%
8 Construction of Road and Culvert 34 0 18 9 2.11 1.49
71%
9 Plantation 34 2 22 4 1.23 0.37
30%
10 Cattle Shed 25 0 1 0 1.13 0.00
0%
11 Boulder Check/Gully Plug 22 0 20 2 1.09 0.69
63%
12 Construction of Tank 15 1 6 5 0.34 0.23
68%
13 Constr of Cement Concrete Roads 14 0 10 0 0.15 0.11
75%
14 Construction of NADEP/Vermi Compost Pit 8 0 4 4 0.01 0.01
88%
15 Construction of Well 7 0 6 0 0.15 0.14
93%
16 Well Recharge 4 0 2 0 0.03 0.00
6%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0 4 0 1.15 0.59
51%
18 Repair & Maint of Check Dam/Stop Dam 4 0 0 4 0.15 0.00
0%
19 Repair & maint of Water Harvesting Structures 3 2 0 1 0.10 0.03
30%
20 Repair & maint of Pond/ Tank 3 0 2 0 0.18 0.15
79%
21 Other Works 3 0 0 0 0.00 0.00
0%
22 Construction of Toilets 2 0 1 0 0.00 0.00
102%
23 Terracing 2 0 0 2 0.00 0.00
0%
24 Constr of Kitchen Shed 2 0 2 0 0.01 0.01
80%
25 Renovation of traditional water bodies 2 0 0 0 0.01 0.00
0%
26 Constr of Aganwadi 2 0 0 2 0.00 0.00
0%
27 Repair & maint of Percolation Tank 2 0 0 2 0.00 0.00
0%
28 Constr of Compound wall 2 1 1 0 0.25 0.11
43%
29 Constr of Gabion 1 0 1 0 0.14 0.09
65%
30 Repair & maint of Road 1 0 1 0 0.08 0.07
94%
31 Constr of GP Bhawan 1 0 1 0 0.13 0.04
30%
32 Constr of Food Grain storage 1 1 0 0 0.12 0.02
15%
33 Roof Water Harvesting on gov/panchayat bldg 1 0 1 0 0.00 0.00
1%
34 Construction of Canal 1 0 1 0 0.02 0.01
65%
35 Construction of Crematorium 1 0 1 0 0.02 0.02
100%
Total 933 8 621 81 15.47 9.22
All 35 rows (zero-value rows hidden) ⇩ Export to Excel