MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Overall

Rollup last refreshed: 2026-09-19 06:51:50.312319 · figures are real, from vg_work_summary_rollup
to
to
Reset filters

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Total works Ongoing Completed Closed Sanctioned Expenditure Exp. %
1 Rural Housing 7,33,865 4,23,880 33,667 0 1,965.22 116.57
6%
2 Plantation 98,410 73,480 62 37 2,362.42 23.94
1%
3 Farm Pond 57,558 15,683 37 2 679.12 1.31
0%
4 Construction of Well 47,267 27,076 43 8 1,019.99 2.94
0%
5 Well Recharge 32,793 5,965 41 1 120.74 0.26
0%
6 Construction of Tank 31,615 8,490 12 14 1,454.29 8.29
1%
7 Constr of Cement Concrete Roads 24,162 10,998 39 9 343.95 1.00
0%
8 Construction of Check Dam/Stop Dam 20,468 6,796 21 1 706.85 3.46
1%
9 Construction of Recharge Pits 14,607 2,027 5 2 41.37 0.35
1%
10 Cattle Shed 10,648 5,052 9 3 260.58 1.58
1%
11 Construction of Trench 8,975 3,844 10 2 244.79 12.19
5%
12 Construction of Road and Culvert 8,540 4,103 11 0 779.13 3.00
0%
13 Construction of Percolation Tank 8,417 2,863 11 0 199.65 0.54
0%
14 Solid and Liquid Waste Management 8,063 3,765 12 2 75.44 0.21
0%
15 Roof Water Harvesting on gov/panchayat bldg 7,654 1,174 9 2 28.68 0.34
1%
16 Construction of NADEP/Vermi Compost Pit 5,789 3,113 11 3 28.82 0.03
0%
17 Repair & maint of Pond/ Tank 5,396 1,900 3 2 135.86 0.25
0%
18 Construction of Bund 4,619 4,443 7 8 367.17 0.21
0%
19 Land Development 4,071 2,218 3 1 132.20 0.52
0%
20 Construction of Crematorium 3,985 1,579 0 0 62.27 0.14
0%
21 Constr of Gabion 3,569 1,239 6 1 52.78 0.36
1%
22 Constr of Aganwadi 2,835 1,955 4 0 101.08 0.03
0%
23 Works for Flood Control and Protection 2,597 1,698 0 2 117.77 0.05
0%
24 Culvert 2,585 1,078 2 2 63.37 0.15
0%
25 Constr of GP Bhawan 2,154 2,041 9 0 142.83 0.55
0%
26 Community Sanitary Complex 1,672 1,324 0 2 25.07 0.05
0%
27 Boulder Check/Gully Plug 1,598 632 2 0 22.33 0.08
0%
28 Constr of Compound wall 1,432 985 1 0 59.53 0.17
0%
29 Construction of Play field 1,392 627 1 0 39.39 0.09
0%
30 Goat Shelter 1,189 467 0 1 11.56 0.01
0%
31 Terracing 961 554 0 0 32.76 0.11
0%
32 Constr of Food Grain storage 885 482 0 0 47.86 0.02
0%
33 Construction of Canal 847 170 0 0 15.30 0.03
0%
34 Poultry Shelter 791 525 0 0 10.94 0.00
0%
35 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 745 590 0 1 33.39 0.14
0%
36 Underground Dyke for Ground Water Recharge 712 93 0 0 7.46 0.04
1%
37 Construction of Toilets 603 474 2 0 6.16 0.01
0%
38 Other Works 599 387 0 0 8.27 0.05
1%
39 Bio-gas plant 522 64 0 0 2.35 0.01
0%
40 Grass Land Development 450 336 0 0 35.56 0.04
0%
41 Nursery Development 435 315 1 0 46.33 0.15
0%
42 Construction of Other Community Building/Assets 381 148 0 0 12.88 0.02
0%
43 Construction of building/workshed for SHG 373 266 1 0 13.73 0.06
0%
44 Repair & maint of Water Harvesting Structures 369 299 0 0 14.87 0.01
0%
45 Repair & Maint of Check Dam/Stop Dam 346 255 0 0 16.40 0.01
0%
46 Repair & maint of Percolation Tank 338 175 1 0 11.85 0.02
0%
47 Constr of Kitchen Shed 327 268 2 0 4.53 0.00
0%
48 Repair & maint of Road 326 212 0 0 15.83 0.01
0%
49 Repair & Maint of Community infrastructure 326 277 0 0 15.67 0.00
0%
50 Construction of Embankment 321 256 0 0 23.95 0.05
0%
51 (uncategorised) 266 15 0 0 0.49 0.02
4%
52 Construction of Spur 249 191 0 0 13.40 0.02
0%
53 Construction of Village Haats 167 64 0 0 3.40 0.20
6%
54 Construction of Fish Drying Infrastructure 157 70 0 0 2.11 0.01
1%
55 Piggery Shelter 71 35 0 0 1.38 0.00
0%
56 Repair & Maint of Bund 64 63 0 0 4.79 0.01
0%
57 Bio-Fertilizer 58 54 0 0 1.14 0.00
0%
58 Lining of Canal 42 40 0 0 8.19 0.00
0%
59 Repair & Maint of Canal 41 37 0 0 2.13 0.00
0%
60 Repaire and Maint of NADEP/Vermi Compost Pit 16 16 0 0 0.21 0.00
0%
61 Renovation of Canal 14 13 0 0 0.98 0.00
0%
62 Renovation of traditional water bodies 10 10 0 0 0.79 0.00
0%
63 Repair & maint of Gully Plugs 4 2 0 0 0.09 0.00
0%
64 Deepening / Desilting of Flood Channels 2 2 0 0 0.00 0.00
0%
65 Repair & Maint of Fish Drying Infrastructure 2 2 0 0 0.09 0.00
0%
Total 11,69,745 6,27,255 34,045 106 12,059.52 179.70
All 65 rows (zero-value rows hidden) ⇩ Export to Excel