Monitor — Ongoing Works
Rollup last refreshed: 2026-09-19 06:51:50.312319
Works ongoing
9
Sanctioned (pure scheme)
₹1.19 Cr
Expenditure since inception
₹0
Balance cost (unspent)
₹1.19 Cr
Wage ₹74.92 L · Material ₹44.12 L
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Slowest spending this week — worth a look
- RAJGARH — SARANGPUR−₹99.49 L
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
2 works
₹39.66 L sanctioned
₹0 spent (0%)
02
Construction of Trench
3 works
₹34.81 L sanctioned
₹0 spent (0%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹28.11 L sanctioned
₹0 spent (0%)
04
Works for Flood Control and Protection
1 works
₹14.11 L sanctioned
₹0 spent (0%)
05
Construction of Crematorium
1 works
₹2.35 L sanctioned
₹0 spent (0%)
06
Rural Housing
0 works
₹0 sanctioned
₹0 spent (0%)