Works ongoing
11,485
Sanctioned (pure scheme)
₹203.65 Cr
Expenditure since inception
₹3.79 Cr
Balance cost (unspent)
₹199.86 Cr
Wage ₹115.70 Cr · Material ₹84.16 Cr
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Slowest spending this week — worth a look
- SHIVPURI — KOLARAS−₹34,632
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
1,397 works
₹31.56 Cr sanctioned
₹73.03 L spent (2%)
02
Construction of Tank
289 works
₹26.95 Cr sanctioned
₹28.09 L spent (1%)
03
Construction of Road and Culvert
153 works
₹26.15 Cr sanctioned
₹9.30 L spent (0%)
04
Rural Housing
6,751 works
₹18.20 Cr sanctioned
₹1.98 Cr spent (11%)
05
Construction of Well
642 works
₹17.90 Cr sanctioned
₹6.77 L spent (0%)
06
Repair & maint of Pond/ Tank
176 works
₹13.88 Cr sanctioned
₹10.73 L spent (1%)
07
Construction of Percolation Tank
283 works
₹10.21 Cr sanctioned
₹10.31 L spent (1%)
08
Construction of Check Dam/Stop Dam
116 works
₹6.72 Cr sanctioned
₹10.73 L spent (2%)
09
Cattle Shed
142 works
₹5.87 Cr sanctioned
₹1.14 L spent (0%)
10
Farm Pond
345 works
₹5.80 Cr sanctioned
₹4.81 L spent (1%)