Monitor — Ongoing Works
Rollup last refreshed: 2026-09-20 06:52:05.620266
Works ongoing
13,223
Sanctioned (pure scheme)
₹119.40 Cr
Expenditure since inception
₹4.16 Cr
Balance cost (unspent)
₹115.25 Cr
Wage ₹70.61 Cr · Material ₹44.63 Cr
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Slowest spending this week — worth a look
- RAJGARH — SARANGPUR−₹99.66 L
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
1,156 works
₹34.66 Cr sanctioned
₹30.06 L spent (1%)
02
Rural Housing
9,989 works
₹26.97 Cr sanctioned
₹2.13 Cr spent (8%)
03
Construction of Well
846 works
₹21.13 Cr sanctioned
₹8.62 L spent (0%)
04
Construction of Check Dam/Stop Dam
139 works
₹6.30 Cr sanctioned
₹8.86 L spent (1%)
05
Cattle Shed
240 works
₹5.64 Cr sanctioned
₹83.97 L spent (15%)
06
Construction of Trench
127 works
₹5.10 Cr sanctioned
₹45.46 L spent (9%)
07
Farm Pond
117 works
₹2.77 Cr sanctioned
₹30,200 spent (0%)
08
Construction of Tank
55 works
₹2.43 Cr sanctioned
₹13.82 L spent (6%)
09
Construction of Percolation Tank
20 works
₹1.76 Cr sanctioned
₹5.68 L spent (3%)
10
Construction of Road and Culvert
15 works
₹1.69 Cr sanctioned
₹0 spent (0%)