Monitor — Ongoing Works
Rollup last refreshed: 2026-09-15 06:52:12.623417
Works ongoing
13,359
Sanctioned (pure scheme)
₹119.61 Cr
Expenditure since inception
₹3.58 Cr
Balance cost (unspent)
₹116.03 Cr
Wage ₹71.43 Cr · Material ₹44.60 Cr
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Slowest spending this week — worth a look
- RAJGARH — SARANGPUR−₹97.29 L
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
1,156 works
₹34.66 Cr sanctioned
₹23.05 L spent (1%)
02
Rural Housing
10,133 works
₹27.36 Cr sanctioned
₹1.70 Cr spent (6%)
03
Construction of Well
846 works
₹21.13 Cr sanctioned
₹7.95 L spent (0%)
04
Construction of Check Dam/Stop Dam
136 works
₹6.23 Cr sanctioned
₹12.35 L spent (2%)
05
Cattle Shed
239 works
₹5.63 Cr sanctioned
₹83.59 L spent (15%)
06
Construction of Trench
125 works
₹5.03 Cr sanctioned
₹37.56 L spent (7%)
07
Farm Pond
116 works
₹2.75 Cr sanctioned
₹26,900 spent (0%)
08
Construction of Tank
55 works
₹2.43 Cr sanctioned
₹13.26 L spent (5%)
09
Construction of Percolation Tank
20 works
₹1.76 Cr sanctioned
₹5.68 L spent (3%)
10
Construction of Road and Culvert
15 works
₹1.69 Cr sanctioned
₹0 spent (0%)