MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-09-16 08:34:45.218851
to
Reset filters
Works ongoing
18
Sanctioned (pure scheme)
₹65.89 L
Expenditure since inception
₹24.87 L
Balance cost (unspent)
₹41.03 L
Wage ₹26.86 L · Material ₹14.17 L
Expenditure trend
−₹1.31 Cr
This Week
−₹1.39 L
Last Week
▼ 9373.8% vs last week
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Slowest spending this week — worth a look
  • SHAHDOL — GOHPARU−₹38.03 L
Mandays trend
-34,842
This Week
-598
Last Week
▼ 5726.4%
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-17,779

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
4 works
₹34.74 L sanctioned
₹16.34 L spent (47%)
02
Works for Flood Control and Protection
1 works
₹4.19 L sanctioned
₹62,322 spent (15%)
03
Bio-Fertilizer
1 works
₹3.85 L sanctioned
₹2.36 L spent (61%)
04
Construction of Bund
1 works
₹3.85 L sanctioned
₹21,216 spent (6%)
05
Construction of NADEP/Vermi Compost Pit
1 works
₹3.85 L sanctioned
₹75,582 spent (20%)
06
Construction of Recharge Pits
1 works
₹3.85 L sanctioned
₹19,890 spent (5%)
07
Terracing
1 works
₹3.85 L sanctioned
₹2.92 L spent (76%)
08
Construction of Trench
1 works
₹3.79 L sanctioned
₹86,100 spent (23%)
09
Constr of Cement Concrete Roads
4 works
₹1.77 L sanctioned
₹15,138 spent (9%)
10
Farm Pond
1 works
₹1.48 L sanctioned
₹3,393 spent (2%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Constr of Cement Concrete Roads 4 1.77 0.15 1.62
9%
2 Plantation 4 34.74 16.34 18.40
47%
3 Bio-Fertilizer 1 3.85 2.36 1.49
61%
4 Constr of Compound wall 1 0.43 0.38 0.05
89%
5 Construction of Bund 1 3.85 0.21 3.64
6%
6 Construction of NADEP/Vermi Compost Pit 1 3.85 0.76 3.10
20%
7 Construction of Recharge Pits 1 3.85 0.20 3.65
5%
8 Construction of Trench 1 3.79 0.86 2.93
23%
9 Farm Pond 1 1.48 0.03 1.44
2%
10 Rural Housing 1 0.23 0.03 0.20
13%
11 Terracing 1 3.85 2.92 0.93
76%
12 Works for Flood Control and Protection 1 4.19 0.62 3.57
15%
Total 18 65.89 24.87 41.03
All 12 rows (zero-value rows hidden) ⇩ Export to Excel