Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
9,945
Sanctioned (pure scheme)
₹160.37 Cr
Expenditure since inception
₹73.26 Cr
Balance cost (unspent)
₹87.11 Cr
Wage ₹48.06 Cr · Material ₹39.05 Cr
Expenditure trend
Slowest spending this month — worth a look
- KHANDWA — PANDHANA−₹80.86 L
- KHANDWA — KHANDWA−₹50.87 L
- SEONI — DHANAURA−₹37.90 L
Mandays trend
Lowest mandays this month — worth a look
- DHAR — KUKSHI-17,658
- DHAR — TIRLA-7,398
- JHABUA — THANDLA-4,753
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
1,051 works
₹32.10 Cr sanctioned
₹11.87 Cr spent (37%)
02
Construction of Well
584 works
₹23.26 Cr sanctioned
₹11.82 Cr spent (51%)
03
Farm Pond
679 works
₹14.02 Cr sanctioned
₹5.48 Cr spent (39%)
04
Rural Housing
5,777 works
₹13.55 Cr sanctioned
₹9.65 Cr spent (71%)
05
Construction of Tank
93 works
₹12.02 Cr sanctioned
₹5.30 Cr spent (44%)
06
Construction of Check Dam/Stop Dam
258 works
₹9.53 Cr sanctioned
₹3.76 Cr spent (39%)
07
Construction of Bund
173 works
₹8.98 Cr sanctioned
₹3.96 Cr spent (44%)
08
Construction of Percolation Tank
147 works
₹6.73 Cr sanctioned
₹2.12 Cr spent (31%)
09
Construction of Road and Culvert
34 works
₹6.45 Cr sanctioned
₹5.08 Cr spent (79%)
10
Repair & maint of Pond/ Tank
60 works
₹4.89 Cr sanctioned
₹2.59 Cr spent (53%)