Monitor — Ongoing Works
Rollup last refreshed: 2026-09-18 07:04:14.05263
Works ongoing
13,216
Sanctioned (pure scheme)
₹119.31 Cr
Expenditure since inception
₹50.73 Cr
Balance cost (unspent)
₹68.58 Cr
Wage ₹39.71 Cr · Material ₹28.87 Cr
Expenditure trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Slowest spending this week — worth a look
- RAJGARH — SARANGPUR−₹1.04 Cr
Mandays trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
1,156 works
₹34.66 Cr sanctioned
₹18.01 Cr spent (52%)
02
Rural Housing
9,985 works
₹26.96 Cr sanctioned
₹11.08 Cr spent (41%)
03
Construction of Well
846 works
₹21.13 Cr sanctioned
₹9.96 Cr spent (47%)
04
Construction of Check Dam/Stop Dam
138 works
₹6.25 Cr sanctioned
₹1.29 Cr spent (21%)
05
Cattle Shed
240 works
₹5.64 Cr sanctioned
₹3.57 Cr spent (63%)
06
Construction of Trench
127 works
₹5.10 Cr sanctioned
₹88.05 L spent (17%)
07
Farm Pond
117 works
₹2.77 Cr sanctioned
₹47.04 L spent (17%)
08
Construction of Tank
55 works
₹2.43 Cr sanctioned
₹82.31 L spent (34%)
09
Construction of Percolation Tank
20 works
₹1.76 Cr sanctioned
₹30.67 L spent (17%)
10
Construction of Road and Culvert
15 works
₹1.69 Cr sanctioned
₹83.38 L spent (49%)