Monitor — Ongoing Works
Rollup last refreshed: 2026-09-16 08:34:45.218851
Works ongoing
16,412
Sanctioned (pure scheme)
₹124.08 Cr
Expenditure since inception
₹57.86 Cr
Balance cost (unspent)
₹66.22 Cr
Wage ₹36.37 Cr · Material ₹29.85 Cr
Expenditure trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Slowest spending this week — worth a look
- SHAHDOL — GOHPARU−₹38.03 L
Mandays trend
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
1,187 works
₹35.41 Cr sanctioned
₹18.06 Cr spent (51%)
02
Rural Housing
13,098 works
₹30.75 Cr sanctioned
₹17.79 Cr spent (58%)
03
Construction of Well
887 works
₹22.03 Cr sanctioned
₹10.73 Cr spent (49%)
04
Construction of Check Dam/Stop Dam
132 works
₹5.99 Cr sanctioned
₹1.32 Cr spent (22%)
05
Cattle Shed
236 works
₹5.58 Cr sanctioned
₹2.83 Cr spent (51%)
06
Construction of Trench
88 works
₹3.74 Cr sanctioned
₹61.65 L spent (16%)
07
Farm Pond
125 works
₹2.92 Cr sanctioned
₹52.54 L spent (18%)
08
Construction of Tank
55 works
₹2.30 Cr sanctioned
₹70.12 L spent (30%)
09
Construction of Percolation Tank
22 works
₹1.83 Cr sanctioned
₹27.58 L spent (15%)
10
Construction of Road and Culvert
16 works
₹1.69 Cr sanctioned
₹83.64 L spent (49%)