Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
3.7%
OF COST SPENT
₹28,800 spent
of ₹7.69 L sanctioned
₹7.40 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹7.69 L
Pure scheme (wage + material)
Expenditure since inception
₹28,800
3.7% of sanction
Balance cost (unspent)
₹7.40 L
Wage₹5.48 L
Material₹1.92 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh