MGNREGA Works Dashboard
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
Reset filters
Works ongoing
557
Sanctioned (pure scheme)
₹35.03 Cr
Expenditure since inception
₹14.91 Cr
Balance cost (unspent)
₹20.13 Cr
Wage ₹11.30 Cr · Material ₹8.83 Cr
Expenditure trend
₹33.04 L
This Week
₹56.93 Cr
Last Week
▼ 99.4% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹27.93 L
Mandays trend
-31,213
This Week
2,63,410
Last Week
▼ 111.8%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-17,779

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
96 works
₹13.67 Cr sanctioned
₹5.69 Cr spent (42%)
02
Plantation
137 works
₹4.93 Cr sanctioned
₹1.06 Cr spent (21%)
03
Construction of Bund
43 works
₹4.84 Cr sanctioned
₹2.12 Cr spent (44%)
04
Construction of Road and Culvert
20 works
₹3.58 Cr sanctioned
₹1.97 Cr spent (55%)
05
Works for Flood Control and Protection
26 works
₹2.15 Cr sanctioned
₹73.67 L spent (34%)
06
Construction of Check Dam/Stop Dam
15 works
₹1.36 Cr sanctioned
₹91.79 L spent (68%)
07
Constr of Cement Concrete Roads
52 works
₹95.08 L sanctioned
₹78.60 L spent (83%)
08
Construction of Trench
7 works
₹82.90 L sanctioned
₹36.86 L spent (44%)
09
Farm Pond
37 works
₹53.84 L sanctioned
₹10.67 L spent (20%)
10
Repair & maint of Pond/ Tank
3 works
₹37.46 L sanctioned
₹6.88 L spent (18%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Plantation 137 4.93 1.06 3.87
22%
2 Construction of Tank 96 13.67 5.69 7.99
42%
3 Rural Housing 85 0.20 0.10 0.10
50%
4 Constr of Cement Concrete Roads 52 0.95 0.79 0.16
83%
5 Construction of Bund 43 4.84 2.12 2.71
44%
6 Farm Pond 37 0.54 0.11 0.43
20%
7 Works for Flood Control and Protection 26 2.15 0.74 1.41
34%
8 Construction of Road and Culvert 20 3.58 1.97 1.61
55%
9 Construction of Check Dam/Stop Dam 15 1.36 0.92 0.44
68%
10 Construction of Trench 7 0.83 0.37 0.46
45%
11 Construction of Crematorium 4 0.13 0.06 0.07
46%
12 Construction of Fish Drying Infrastructure 4 0.06 0.01 0.05
12%
13 Constr of Aganwadi 4 0.20 0.03 0.17
13%
14 Terracing 3 0.30 0.28 0.02
93%
15 Repair & maint of Pond/ Tank 3 0.37 0.07 0.31
18%
16 Constr of Food Grain storage 3 0.08 0.07 0.01
93%
17 Construction of Recharge Pits 3 0.03 0.00 0.03
5%
18 Construction of Well 2 0.01 0.00 0.00
31%
19 Constr of GP Bhawan 2 0.12 0.10 0.02
83%
20 Construction of Spur 2 0.19 0.09 0.11
46%
21 Solid and Liquid Waste Management 2 0.02 0.02 0.00
97%
22 Constr of Gabion 1 0.14 0.14 0.00
98%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.00 0.00 0.00
84%
24 Construction of Canal 1 0.01 0.01 0.00
62%
25 Boulder Check/Gully Plug 1 0.04 0.00 0.04
1%
26 Repair & maint of Road 1 0.15 0.10 0.05
64%
27 Construction of Embankment 1 0.13 0.08 0.05
60%
28 Well Recharge 1 0.00 0.00 0.00
1%
Total 557 35.03 14.91 20.13
All 28 rows (zero-value rows hidden) ⇩ Export to Excel