MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Monitor — Ongoing Works

Rollup last refreshed: 2026-08-27 14:06:46.546602
to
Reset filters
Works ongoing
544
Sanctioned (pure scheme)
₹34.85 Cr
Expenditure since inception
₹15.64 Cr
Balance cost (unspent)
₹19.21 Cr
Wage ₹11.26 Cr · Material ₹7.95 Cr
Expenditure trend
−₹1.49 Cr
This Week
−₹1.47 Cr
Last Week
▼ 1.6% vs last week
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹90.28 L
Mandays trend
-94,475
This Week
-1,36,226
Last Week
▲ 30.6%
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-53,337

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
96 works
₹13.67 Cr sanctioned
₹6.23 Cr spent (46%)
02
Plantation
136 works
₹4.92 Cr sanctioned
₹1.10 Cr spent (22%)
03
Construction of Bund
43 works
₹4.84 Cr sanctioned
₹2.26 Cr spent (47%)
04
Construction of Road and Culvert
20 works
₹3.58 Cr sanctioned
₹1.97 Cr spent (55%)
05
Works for Flood Control and Protection
26 works
₹2.15 Cr sanctioned
₹75.27 L spent (35%)
06
Construction of Check Dam/Stop Dam
15 works
₹1.36 Cr sanctioned
₹91.79 L spent (68%)
07
Constr of Cement Concrete Roads
52 works
₹95.08 L sanctioned
₹78.28 L spent (82%)
08
Construction of Trench
7 works
₹82.90 L sanctioned
₹36.86 L spent (44%)
09
Farm Pond
28 works
₹40.56 L sanctioned
₹10.58 L spent (26%)
10
Repair & maint of Pond/ Tank
3 works
₹37.46 L sanctioned
₹6.88 L spent (18%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Plantation 136 4.92 1.10 3.81
23%
2 Construction of Tank 96 13.67 6.23 7.45
46%
3 Rural Housing 85 0.20 0.10 0.10
49%
4 Constr of Cement Concrete Roads 52 0.95 0.78 0.17
82%
5 Construction of Bund 43 4.84 2.26 2.58
47%
6 Farm Pond 28 0.41 0.11 0.30
26%
7 Works for Flood Control and Protection 26 2.15 0.75 1.40
35%
8 Construction of Road and Culvert 20 3.58 1.97 1.61
55%
9 Construction of Check Dam/Stop Dam 15 1.36 0.92 0.44
68%
10 Construction of Trench 7 0.83 0.37 0.46
45%
11 Construction of Crematorium 4 0.13 0.06 0.07
46%
12 Constr of Aganwadi 4 0.20 0.03 0.17
13%
13 Constr of Food Grain storage 3 0.08 0.07 0.01
93%
14 Repair & maint of Pond/ Tank 3 0.37 0.07 0.31
18%
15 Terracing 3 0.30 0.28 0.02
93%
16 Construction of Recharge Pits 2 0.02 0.00 0.02
7%
17 Constr of GP Bhawan 2 0.12 0.10 0.02
83%
18 Construction of Fish Drying Infrastructure 2 0.03 0.01 0.02
24%
19 Construction of Spur 2 0.19 0.09 0.11
46%
20 Construction of Well 2 0.01 0.00 0.00
31%
21 Solid and Liquid Waste Management 2 0.02 0.02 0.00
97%
22 Constr of Gabion 1 0.14 0.14 0.00
98%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.00 0.00 0.00
84%
24 Well Recharge 1 0.00 0.00 0.00
1%
25 Boulder Check/Gully Plug 1 0.04 0.00 0.04
1%
26 Repair & maint of Road 1 0.15 0.10 0.05
64%
27 Construction of Embankment 1 0.13 0.08 0.05
60%
28 Construction of Canal 1 0.01 0.01 0.00
62%
Total 544 34.85 15.64 19.21
All 28 rows (zero-value rows hidden) ⇩ Export to Excel