Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
7
Sanctioned (pure scheme)
₹67.66 L
Expenditure since inception
₹55.17 L
Balance cost (unspent)
₹12.49 L
Wage ₹4.96 L · Material ₹7.53 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
1 works
₹19.89 L sanctioned
₹16.77 L spent (84%)
02
Construction of Tank
1 works
₹14.88 L sanctioned
₹9.16 L spent (62%)
03
Construction of Check Dam/Stop Dam
1 works
₹14.44 L sanctioned
₹14.08 L spent (97%)
04
Works for Flood Control and Protection
1 works
₹14.02 L sanctioned
₹12.19 L spent (87%)
05
Farm Pond
3 works
₹4.43 L sanctioned
₹2.98 L spent (67%)
06
Construction of Play field
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Recharge Pits
0 works
₹0 sanctioned
₹0 spent (0%)
08
Boulder Check/Gully Plug
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
10
Deepening / Desilting of Flood Channels
0 works
₹0 sanctioned
₹0 spent (0%)