Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
11
Sanctioned (pure scheme)
₹1.11 Cr
Expenditure since inception
₹82.34 L
Balance cost (unspent)
₹28.84 L
Wage ₹12.40 L · Material ₹16.44 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Slowest spending this week — worth a look
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
3 works
₹43.48 L sanctioned
₹27.33 L spent (63%)
02
Construction of Road and Culvert
1 works
₹24.91 L sanctioned
₹22.91 L spent (92%)
03
Works for Flood Control and Protection
2 works
₹19.85 L sanctioned
₹16.19 L spent (82%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.53 L sanctioned
₹13.59 L spent (94%)
05
Plantation
2 works
₹5.98 L sanctioned
₹27,788 spent (5%)
06
Constr of GP Bhawan
1 works
₹2.18 L sanctioned
₹1.89 L spent (87%)
07
Well Recharge
1 works
₹25,899 sanctioned
₹15,138 spent (58%)
08
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Recharge Pits
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Tank
0 works
₹0 sanctioned
₹0 spent (0%)