Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
27
Sanctioned (pure scheme)
₹1.80 Cr
Expenditure since inception
₹1.20 Cr
Balance cost (unspent)
₹59.77 L
Wage ₹34.40 L · Material ₹25.38 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
4 works
₹58.24 L sanctioned
₹40.93 L spent (70%)
02
Works for Flood Control and Protection
4 works
₹40.38 L sanctioned
₹24.03 L spent (59%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹29.70 L sanctioned
₹24.88 L spent (84%)
04
Construction of Bund
3 works
₹29.40 L sanctioned
₹18.71 L spent (64%)
05
Construction of Check Dam/Stop Dam
2 works
₹13.88 L sanctioned
₹10.87 L spent (78%)
06
Construction of NADEP/Vermi Compost Pit
5 works
₹4.27 L sanctioned
₹9,396 spent (2%)
07
Farm Pond
2 works
₹2.95 L sanctioned
₹76,526 spent (26%)
08
Well Recharge
5 works
₹1.24 L sanctioned
₹1,305 spent (1%)
09
Construction of Road and Culvert
0 works
₹0 sanctioned
₹0 spent (0%)
10
Cattle Shed
0 works
₹0 sanctioned
₹0 spent (0%)