Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
9
Sanctioned (pure scheme)
₹1.19 Cr
Expenditure since inception
₹75.49 L
Balance cost (unspent)
₹43.55 L
Wage ₹32.91 L · Material ₹10.65 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Slowest spending this week — worth a look
- KHANDWA — PANDHANA−₹93.68 L
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
2 works
₹39.66 L sanctioned
₹26.83 L spent (68%)
02
Construction of Trench
3 works
₹34.81 L sanctioned
₹12.69 L spent (36%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹28.11 L sanctioned
₹24.19 L spent (86%)
04
Works for Flood Control and Protection
1 works
₹14.11 L sanctioned
₹10.04 L spent (71%)
05
Construction of Crematorium
1 works
₹2.35 L sanctioned
₹1.74 L spent (74%)
06
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)
07
Construction of Recharge Pits
0 works
₹0 sanctioned
₹0 spent (0%)
08
Boulder Check/Gully Plug
0 works
₹0 sanctioned
₹0 spent (0%)
09
Farm Pond
0 works
₹0 sanctioned
₹0 spent (0%)
10
Land Development
0 works
₹0 sanctioned
₹0 spent (0%)