Monitor — Ongoing Works

Rollup last refreshed: 2026-10-16 08:36:19.743515
to
Reset filters
Works ongoing
1,089
Sanctioned (pure scheme)
₹131.21 Cr
Expenditure since inception
₹81.93 Cr
Balance cost (unspent)
₹49.28 Cr
Wage ₹33.65 Cr · Material ₹15.63 Cr
Expenditure trend
−₹79.59 L
This Week
−₹78.03 L
Last Week
▼ 2% vs last week
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
12-Oct
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹37.79 L
Mandays trend
-34,721
This Week
-33,130
Last Week
▼ 4.8%
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
12-Oct
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-17,779

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
299 works
₹45.83 Cr sanctioned
₹29.81 Cr spent (65%)
02
Construction of Bund
308 works
₹43.73 Cr sanctioned
₹28.10 Cr spent (64%)
03
Plantation
160 works
₹8.63 Cr sanctioned
₹3.35 Cr spent (39%)
04
Land Development
34 works
₹5.05 Cr sanctioned
₹3.45 Cr spent (68%)
05
Works for Flood Control and Protection
37 works
₹4.96 Cr sanctioned
₹2.96 Cr spent (60%)
06
Construction of Check Dam/Stop Dam
34 works
₹4.55 Cr sanctioned
₹2.87 Cr spent (63%)
07
Construction of Trench
25 works
₹3.30 Cr sanctioned
₹2.29 Cr spent (70%)
08
Construction of Road and Culvert
12 works
₹2.91 Cr sanctioned
₹1.88 Cr spent (64%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
9 works
₹1.14 Cr sanctioned
₹93.58 L spent (82%)
10
Repair & maint of Road
4 works
₹1.06 Cr sanctioned
₹77.79 L spent (73%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Construction of Bund 308 43.73 28.10 15.63
64%
2 Construction of Tank 299 45.83 29.81 16.02
65%
3 Plantation 160 8.63 3.35 5.29
39%
4 Rural Housing 65 0.15 0.05 0.10
35%
5 Works for Flood Control and Protection 37 4.96 2.96 2.00
60%
6 Land Development 34 5.05 3.45 1.60
68%
7 Construction of Check Dam/Stop Dam 34 4.55 2.87 1.68
63%
8 Construction of Trench 25 3.30 2.29 1.00
70%
9 Construction of Road and Culvert 12 2.91 1.88 1.03
65%
10 Construction of Crematorium 12 0.34 0.27 0.07
79%
11 Boulder Check/Gully Plug 12 0.76 0.29 0.47
38%
12 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 9 1.14 0.94 0.21
82%
13 Constr of GP Bhawan 8 0.79 0.19 0.60
24%
14 Constr of Aganwadi 5 0.25 0.10 0.15
42%
15 Repair & maint of Water Harvesting Structures 5 0.75 0.62 0.13
83%
16 Constr of Gabion 5 0.93 0.81 0.13
86%
17 Terracing 5 0.63 0.41 0.22
65%
18 Construction of Embankment 5 0.61 0.46 0.15
75%
19 Farm Pond 4 0.09 0.04 0.05
40%
20 Repair & Maint of Check Dam/Stop Dam 4 0.52 0.41 0.10
80%
21 Repair & maint of Road 4 1.06 0.78 0.28
73%
22 Construction of Spur 4 0.69 0.60 0.09
87%
23 Nursery Development 3 0.64 0.04 0.60
6%
24 Construction of Percolation Tank 3 0.87 0.27 0.61
30%
25 Construction of Well 3 0.04 0.03 0.01
75%
26 Construction of Recharge Pits 2 0.02 0.01 0.01
65%
27 Constr of Cement Concrete Roads 2 0.29 0.29 0.01
98%
28 Repair & maint of Pond/ Tank 2 0.30 0.23 0.07
77%
29 Cattle Shed 2 0.41 0.03 0.38
8%
30 Constr of Food Grain storage 2 0.41 0.03 0.39
6%
31 Solid and Liquid Waste Management 2 0.10 0.03 0.07
31%
32 Poultry Shelter 1 0.02 0.02 0.00
87%
33 Construction of NADEP/Vermi Compost Pit 1 0.06 0.03 0.03
46%
34 Construction of Village Haats 1 0.03 0.03 0.00
86%
35 Bio-gas plant 1 0.02 0.00 0.02
2%
36 Construction of Canal 1 0.03 0.03 0.00
88%
37 Lining of Canal 1 0.15 0.13 0.02
89%
38 Bio-Fertilizer 1 0.02 0.00 0.02
6%
39 Other Works 1 0.01 0.01 0.01
37%
40 Repair & Maint of Community infrastructure 1 0.03 0.03 0.00
88%
41 Roof Water Harvesting on gov/panchayat bldg 1 0.05 0.04 0.01
74%
42 Community Sanitary Complex 1 0.00 0.00 0.00
75%
43 Well Recharge 1 0.00 0.00 0.00
0%
Total 1,089 131.21 81.93 49.28
All 43 rows (zero-value rows hidden) ⇩ Export to Excel