Works ongoing
1,109
Sanctioned (pure scheme)
₹130.98 Cr
Expenditure since inception
₹77.65 Cr
Balance cost (unspent)
₹53.33 Cr
Wage ₹34.65 Cr · Material ₹18.68 Cr
Expenditure trend
₹2.90 Cr
This Week
₹56.93 Cr
Last Week
▼ 94.9% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹1.18 Cr
Mandays trend
-1,20,992
This Week
2,63,410
Last Week
▼ 145.9%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-71,066

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
295 works
₹44.70 Cr sanctioned
₹27.83 Cr spent (62%)
02
Construction of Bund
308 works
₹43.73 Cr sanctioned
₹27.13 Cr spent (62%)
03
Plantation
160 works
₹8.63 Cr sanctioned
₹3.21 Cr spent (37%)
04
Land Development
36 works
₹5.08 Cr sanctioned
₹3.43 Cr spent (67%)
05
Works for Flood Control and Protection
37 works
₹4.96 Cr sanctioned
₹2.80 Cr spent (57%)
06
Construction of Check Dam/Stop Dam
34 works
₹4.55 Cr sanctioned
₹2.75 Cr spent (61%)
07
Construction of Trench
25 works
₹3.30 Cr sanctioned
₹2.28 Cr spent (69%)
08
Construction of Road and Culvert
12 works
₹2.91 Cr sanctioned
₹1.87 Cr spent (64%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
9 works
₹1.14 Cr sanctioned
₹66.53 L spent (58%)
10
Repair & maint of Road
4 works
₹1.06 Cr sanctioned
₹77.69 L spent (73%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Construction of Bund 308 43.73 27.13 16.61
62%
2 Construction of Tank 295 44.70 27.83 16.87
62%
3 Plantation 160 8.63 3.21 5.42
37%
4 Rural Housing 66 0.15 0.05 0.10
35%
5 Works for Flood Control and Protection 37 4.96 2.80 2.16
57%
6 Land Development 36 5.08 3.43 1.65
68%
7 Construction of Check Dam/Stop Dam 34 4.55 2.75 1.80
61%
8 Construction of Trench 25 3.30 2.28 1.02
69%
9 Farm Pond 22 0.84 0.04 0.80
5%
10 Boulder Check/Gully Plug 12 0.76 0.26 0.50
35%
11 Construction of Road and Culvert 12 2.91 1.87 1.04
64%
12 Construction of Crematorium 12 0.34 0.27 0.07
79%
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 9 1.14 0.67 0.48
58%
14 Constr of GP Bhawan 8 0.79 0.14 0.65
18%
15 Constr of Aganwadi 6 0.35 0.07 0.28
19%
16 Terracing 5 0.63 0.37 0.27
58%
17 Repair & maint of Water Harvesting Structures 5 0.75 0.35 0.40
47%
18 Constr of Gabion 5 0.93 0.63 0.30
67%
19 Construction of Embankment 5 0.61 0.46 0.15
75%
20 Construction of Well 4 0.05 0.03 0.02
54%
21 Construction of Spur 4 0.69 0.60 0.09
87%
22 Repair & Maint of Check Dam/Stop Dam 4 0.52 0.41 0.10
80%
23 Repair & maint of Road 4 1.06 0.78 0.28
73%
24 Nursery Development 3 0.64 0.02 0.62
3%
25 Construction of Percolation Tank 3 0.87 0.27 0.61
31%
26 Construction of Recharge Pits 3 0.03 0.01 0.02
35%
27 Constr of Cement Concrete Roads 2 0.29 0.29 0.01
98%
28 Cattle Shed 2 0.41 0.03 0.38
8%
29 Repair & maint of Pond/ Tank 2 0.30 0.23 0.07
77%
30 Constr of Food Grain storage 2 0.41 0.03 0.39
6%
31 Solid and Liquid Waste Management 2 0.10 0.03 0.07
31%
32 Poultry Shelter 1 0.02 0.02 0.00
87%
33 Roof Water Harvesting on gov/panchayat bldg 1 0.05 0.04 0.01
74%
34 Community Sanitary Complex 1 0.00 0.00 0.00
75%
35 Construction of NADEP/Vermi Compost Pit 1 0.06 0.03 0.03
46%
36 Lining of Canal 1 0.15 0.13 0.02
87%
37 Well Recharge 1 0.00 0.00 0.00
0%
38 Bio-Fertilizer 1 0.02 0.00 0.02
6%
39 Bio-gas plant 1 0.02 0.00 0.02
2%
40 Other Works 1 0.01 0.01 0.01
37%
41 Repair & Maint of Community infrastructure 1 0.03 0.03 0.00
88%
42 Construction of Village Haats 1 0.03 0.03 0.00
86%
43 Construction of Canal 1 0.03 0.03 0.00
89%
Total 1,109 130.98 77.65 53.33