Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
15
Sanctioned (pure scheme)
₹1.04 Cr
Expenditure since inception
₹16.96 L
Balance cost (unspent)
₹86.63 L
Wage ₹50.32 L · Material ₹36.31 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Slowest spending this week — worth a look
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
2 works
₹29.00 L sanctioned
₹3,860 spent (0%)
02
Repair & maint of Water Harvesting Structures
4 works
₹25.61 L sanctioned
₹6.87 L spent (27%)
03
Repair & maint of Percolation Tank
2 works
₹16.71 L sanctioned
₹3.15 L spent (19%)
04
Construction of Percolation Tank
2 works
₹15.63 L sanctioned
₹2.22 L spent (14%)
05
Construction of Bund
1 works
₹9.27 L sanctioned
₹4.03 L spent (43%)
06
Constr of Aganwadi
2 works
₹3.60 L sanctioned
₹52,060 spent (14%)
07
Boulder Check/Gully Plug
1 works
₹3.53 L sanctioned
₹2,448 spent (1%)
08
Rural Housing
1 works
₹23,490 sanctioned
₹10,422 spent (44%)
09
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)