Monitor — Ongoing Works
Rollup last refreshed: 2026-10-14 07:05:44.899714
Works ongoing
12
Sanctioned (pure scheme)
₹1.37 Cr
Expenditure since inception
₹99.52 L
Balance cost (unspent)
₹37.44 L
Wage ₹28.95 L · Material ₹8.48 L
Expenditure trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Slowest spending this week — worth a look
- SHIVPURI — KOLARAS−₹34,632
Mandays trend
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
21-Sep
28-Sep
05-Oct
12-Oct
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
3 works
₹44.69 L sanctioned
₹31.51 L spent (70%)
02
Construction of Bund
3 works
₹43.77 L sanctioned
₹34.38 L spent (79%)
03
Works for Flood Control and Protection
2 works
₹20.34 L sanctioned
₹16.33 L spent (80%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.63 L sanctioned
₹11.40 L spent (78%)
05
Farm Pond
1 works
₹4.51 L sanctioned
₹1.96 L spent (44%)
06
Construction of Trench
1 works
₹4.51 L sanctioned
₹1.97 L spent (44%)
07
Construction of Well
1 works
₹4.51 L sanctioned
₹1.97 L spent (44%)
08
Construction of Canal
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Check Dam/Stop Dam
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Crematorium
0 works
₹0 sanctioned
₹0 spent (0%)