Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
15
Sanctioned (pure scheme)
₹2.03 Cr
Expenditure since inception
₹1.45 Cr
Balance cost (unspent)
₹58.24 L
Wage ₹31.27 L · Material ₹26.97 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Slowest spending this week — worth a look
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
4 works
₹63.24 L sanctioned
₹53.69 L spent (85%)
02
Construction of Bund
4 works
₹62.60 L sanctioned
₹35.90 L spent (57%)
03
Works for Flood Control and Protection
3 works
₹41.05 L sanctioned
₹36.39 L spent (89%)
04
Repair & Maint of Bund
1 works
₹14.84 L sanctioned
₹37,908 spent (3%)
05
Construction of Percolation Tank
1 works
₹14.81 L sanctioned
₹13.23 L spent (89%)
06
Farm Pond
1 works
₹4.51 L sanctioned
₹3.26 L spent (72%)
07
Repair & maint of Pond/ Tank
1 works
₹1.79 L sanctioned
₹1.75 L spent (97%)
08
Construction of Check Dam/Stop Dam
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Recharge Pits
0 works
₹0 sanctioned
₹0 spent (0%)