Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
34
Sanctioned (pure scheme)
₹3.62 Cr
Expenditure since inception
₹1.64 Cr
Balance cost (unspent)
₹1.98 Cr
Wage ₹1.26 Cr · Material ₹72.38 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Slowest spending this week — worth a look
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
10 works
₹1.73 Cr sanctioned
₹71.51 L spent (41%)
02
Farm Pond
14 works
₹60.09 L sanctioned
₹25.71 L spent (43%)
03
Repair & maint of Pond/ Tank
3 works
₹53.82 L sanctioned
₹21.67 L spent (40%)
04
Constr of Cement Concrete Roads
2 works
₹32.55 L sanctioned
₹21.90 L spent (67%)
05
Construction of Check Dam/Stop Dam
1 works
₹14.93 L sanctioned
₹12.23 L spent (82%)
06
Repair & maint of Road
1 works
₹14.30 L sanctioned
₹10,608 spent (1%)
07
Construction of Road and Culvert
1 works
₹13.17 L sanctioned
₹10.88 L spent (83%)
08
Construction of Recharge Pits
2 works
₹51,799 sanctioned
₹29,232 spent (56%)
09
Construction of Toilets
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)