Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
67
Sanctioned (pure scheme)
₹4.35 Cr
Expenditure since inception
₹2.50 Cr
Balance cost (unspent)
₹1.84 Cr
Wage ₹1.20 Cr · Material ₹64.48 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
15 works
₹1.87 Cr sanctioned
₹57.39 L spent (31%)
02
Construction of Check Dam/Stop Dam
5 works
₹74.10 L sanctioned
₹68.45 L spent (92%)
03
Construction of Road and Culvert
4 works
₹50.16 L sanctioned
₹47.30 L spent (94%)
04
Works for Flood Control and Protection
3 works
₹42.72 L sanctioned
₹33.41 L spent (78%)
05
Construction of Bund
2 works
₹29.49 L sanctioned
₹20.21 L spent (69%)
06
Farm Pond
5 works
₹22.54 L sanctioned
₹6.17 L spent (27%)
07
Constr of Gabion
1 works
₹14.93 L sanctioned
₹13.45 L spent (90%)
08
Plantation
4 works
₹7.25 L sanctioned
₹68,651 spent (9%)
09
Rural Housing
26 works
₹6.11 L sanctioned
₹3.40 L spent (56%)
10
Construction of Well
2 works
₹51,799 sanctioned
₹522 spent (1%)