Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
28
Sanctioned (pure scheme)
₹1.14 Cr
Expenditure since inception
₹31.32 L
Balance cost (unspent)
₹82.18 L
Wage ₹22.63 L · Material ₹59.55 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
3 works
₹31.96 L sanctioned
₹5.90 L spent (18%)
02
Construction of Tank
1 works
₹14.72 L sanctioned
₹4,641 spent (0%)
03
Construction of Check Dam/Stop Dam
1 works
₹14.37 L sanctioned
₹14.90 L spent (104%)
04
Lining of Canal
1 works
₹13.10 L sanctioned
₹1.04 L spent (8%)
05
Works for Flood Control and Protection
1 works
₹11.91 L sanctioned
₹2.90 L spent (24%)
06
Plantation
4 works
₹9.42 L sanctioned
₹63,347 spent (7%)
07
Culvert
1 works
₹7.45 L sanctioned
₹3.75 L spent (50%)
08
Constr of Cement Concrete Roads
2 works
₹3.63 L sanctioned
₹66,180 spent (18%)
09
Farm Pond
2 works
₹2.95 L sanctioned
₹14,616 spent (5%)
10
Rural Housing
9 works
₹2.11 L sanctioned
₹92,961 spent (44%)