Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
18
Sanctioned (pure scheme)
₹60.40 L
Expenditure since inception
₹8.41 L
Balance cost (unspent)
₹51.99 L
Wage ₹27.31 L · Material ₹24.68 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
4 works
₹22.67 L sanctioned
₹27,899 spent (1%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹18.50 L sanctioned
₹3.27 L spent (18%)
03
Farm Pond
2 works
₹9.02 L sanctioned
₹4.41 L spent (49%)
04
Plantation
4 works
₹8.53 L sanctioned
₹1,827 spent (0%)
05
Rural Housing
5 works
₹1.17 L sanctioned
₹39,933 spent (34%)
06
Constr of Cement Concrete Roads
1 works
₹50,000 sanctioned
₹3,132 spent (6%)
07
Construction of Check Dam/Stop Dam
0 works
₹0 sanctioned
₹0 spent (0%)
08
Construction of Crematorium
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Percolation Tank
0 works
₹0 sanctioned
₹0 spent (0%)