Works ongoing
975
Sanctioned (pure scheme)
₹30.76 Cr
Expenditure since inception
₹6.22 Cr
Balance cost (unspent)
₹24.54 Cr
Wage ₹13.09 Cr · Material ₹11.45 Cr
Expenditure trend
₹2.90 Cr
This Week
₹56.93 Cr
Last Week
▼ 94.9% vs last week
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
Slowest spending this week — worth a look
  • DHAR — TIRLA−₹1.18 Cr
Mandays trend
-1,20,992
This Week
2,63,410
Last Week
▼ 145.9%
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
Lowest mandays this week — worth a look
  • DHAR — KUKSHI-71,066

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
44 works
₹5.54 Cr sanctioned
₹1.17 Cr spent (21%)
02
Works for Flood Control and Protection
56 works
₹3.73 Cr sanctioned
₹57.11 L spent (15%)
03
Construction of Road and Culvert
17 works
₹3.34 Cr sanctioned
₹1.15 Cr spent (35%)
04
Plantation
108 works
₹3.26 Cr sanctioned
₹31.86 L spent (10%)
05
Construction of Check Dam/Stop Dam
25 works
₹2.32 Cr sanctioned
₹33.43 L spent (14%)
06
Farm Pond
61 works
₹1.50 Cr sanctioned
₹32.71 L spent (22%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
16 works
₹1.36 Cr sanctioned
₹19.36 L spent (14%)
08
Constr of GP Bhawan
17 works
₹1.29 Cr sanctioned
₹33.47 L spent (26%)
09
Construction of Trench
8 works
₹1.09 Cr sanctioned
₹10.99 L spent (10%)
10
Rural Housing
475 works
₹1.09 Cr sanctioned
₹71.64 L spent (66%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Ongoing works Sanctioned Expenditure Balance cost Exp. %
1 Rural Housing 475 1.09 0.72 0.38
66%
2 Plantation 108 3.26 0.32 2.94
10%
3 Farm Pond 61 1.50 0.33 1.17
22%
4 Works for Flood Control and Protection 56 3.73 0.57 3.16
15%
5 Construction of Tank 44 5.54 1.17 4.37
21%
6 Cattle Shed 28 0.85 0.06 0.79
8%
7 Construction of Check Dam/Stop Dam 25 2.32 0.33 1.99
14%
8 Constr of Cement Concrete Roads 18 0.40 0.07 0.34
16%
9 Construction of NADEP/Vermi Compost Pit 18 0.10 0.02 0.08
16%
10 Construction of Road and Culvert 17 3.34 1.15 2.18
35%
11 Constr of GP Bhawan 17 1.29 0.33 0.95
26%
12 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 16 1.36 0.19 1.17
14%
13 Construction of Bund 15 1.05 0.11 0.94
11%
14 Construction of Crematorium 9 0.28 0.09 0.19
33%
15 Construction of Trench 8 1.09 0.11 0.98
10%
16 Constr of Aganwadi 8 0.28 0.17 0.11
61%
17 Constr of Compound wall 8 0.98 0.08 0.90
8%
18 Lining of Canal 8 0.47 0.16 0.31
34%
19 Solid and Liquid Waste Management 7 0.02 0.00 0.01
17%
20 Land Development 4 0.39 0.08 0.31
20%
21 Construction of Percolation Tank 4 0.14 0.01 0.13
9%
22 Community Sanitary Complex 3 0.01 0.01 0.00
69%
23 Construction of Recharge Pits 3 0.22 0.02 0.20
8%
24 Terracing 3 0.14 0.01 0.13
9%
25 Repair & maint of Road 2 0.40 0.05 0.35
12%
26 Construction of Canal 1 0.04 0.00 0.04
5%
27 Boulder Check/Gully Plug 1 0.03 0.00 0.03
3%
28 Constr of Kitchen Shed 1 0.02 0.01 0.00
81%
29 Construction of Spur 1 0.04 0.00 0.04
0%
30 Culvert 1 0.14 0.00 0.14
3%
31 Repair & Maint of Bund 1 0.01 0.00 0.00
17%
32 Repair & Maint of Check Dam/Stop Dam 1 0.13 0.01 0.12
6%
33 Repair & Maint of Community infrastructure 1 0.08 0.02 0.06
21%
34 Repair & maint of Pond/ Tank 1 0.02 0.00 0.02
4%
35 Well Recharge 1 0.00 0.00 0.00
8%
Total 975 30.76 6.22 24.54