Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
26
Sanctioned (pure scheme)
₹28.35 L
Expenditure since inception
₹5.14 L
Balance cost (unspent)
₹23.22 L
Wage ₹16.05 L · Material ₹7.17 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹11.59 L sanctioned
₹73,919 spent (6%)
02
Farm Pond
4 works
₹5.90 L sanctioned
₹17,748 spent (3%)
03
Cattle Shed
3 works
₹2.67 L sanctioned
₹31,176 spent (12%)
04
Plantation
1 works
₹2.64 L sanctioned
₹45,597 spent (17%)
05
Constr of Cement Concrete Roads
6 works
₹2.15 L sanctioned
₹1.24 L spent (57%)
06
Rural Housing
9 works
₹2.11 L sanctioned
₹1.57 L spent (74%)
07
Works for Flood Control and Protection
1 works
₹86,000 sanctioned
₹22,542 spent (26%)
08
Construction of Toilets
1 works
₹43,000 sanctioned
₹41,990 spent (98%)
09
Construction of Crematorium
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of NADEP/Vermi Compost Pit
0 works
₹0 sanctioned
₹0 spent (0%)