Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
20
Sanctioned (pure scheme)
₹80.79 L
Expenditure since inception
₹18.52 L
Balance cost (unspent)
₹62.27 L
Wage ₹37.41 L · Material ₹24.86 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Constr of Cement Concrete Roads
2 works
₹16.22 L sanctioned
₹6.54 L spent (40%)
02
Construction of Embankment
1 works
₹14.96 L sanctioned
₹7.99 L spent (53%)
03
Construction of Bund
1 works
₹14.78 L sanctioned
₹11,934 spent (1%)
04
Works for Flood Control and Protection
2 works
₹10.48 L sanctioned
₹1.48 L spent (14%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹8.64 L sanctioned
₹96,636 spent (11%)
06
Solid and Liquid Waste Management
1 works
₹6.82 L sanctioned
₹5,790 spent (1%)
07
Farm Pond
3 works
₹6.52 L sanctioned
₹43,119 spent (7%)
08
Rural Housing
8 works
₹1.88 L sanctioned
₹85,098 spent (45%)
09
Repair & maint of Pond/ Tank
1 works
₹48,874 sanctioned
₹8,840 spent (18%)
10
Construction of Play field
0 works
₹0 sanctioned
₹0 spent (0%)