Monitor — Ongoing Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Works ongoing
34
Sanctioned (pure scheme)
₹33.20 L
Expenditure since inception
₹7.23 L
Balance cost (unspent)
₹25.97 L
Wage ₹7.41 L · Material ₹18.56 L
Expenditure trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Mandays trend
13-Jul
20-Jul
27-Jul
03-Aug
10-Aug
17-Aug
24-Aug
31-Aug
07-Sep
14-Sep
28-Sep
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Cattle Shed
21 works
₹21.28 L sanctioned
₹4.19 L spent (20%)
02
Constr of Cement Concrete Roads
3 works
₹3.87 L sanctioned
₹1.45 L spent (37%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹3.24 L sanctioned
₹65,616 spent (20%)
04
Works for Flood Control and Protection
2 works
₹3.00 L sanctioned
₹57,891 spent (19%)
05
Rural Housing
6 works
₹1.41 L sanctioned
₹24,840 spent (18%)
06
Construction of NADEP/Vermi Compost Pit
1 works
₹40,000 sanctioned
₹10,422 spent (26%)
07
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
08
Farm Pond
0 works
₹0 sanctioned
₹0 spent (0%)
09
Land Development
0 works
₹0 sanctioned
₹0 spent (0%)
10
Plantation
0 works
₹0 sanctioned
₹0 spent (0%)